Abstract:Research purposes: The construction the Xi'an North Station was divided into the northern and southern areas and the dewatering engineering was also divided into northern and southern areas. The dewatering engineering was conducted twice separately to these two areas and the second dewatering engineering was conducted in about half year later of the first dewatering engineering. As the area of the foundation pit was large and the buried depth of the foundation was different, the dewatering was conducted in two phases according to the engineering conditions of the engineering site. The analysis and research were done on the dewatering process to know the influence of dewatering.
Research conclusions: The research showed in order to make the dewatering reasonable and effective, the following works must be done well: (1) The geological and hydrological conditions had to be well known before the dewatering engineering began. (2) The dewatering well had to be laid out reasonably in order to give the full play to the dewatering well. (3) The dewatering checking had to be precise. (4) The engineering organization had to be scientific. (5) The engineering management had to be strict. (6) The dewatering monitoring had to be accurate to avoid the appearance of the unexpected accidents.
薛秋生. 西安北站大面积深基坑降水技术分析[J]. 铁道工程学报, 2013, 30(1): 105-109.
XUE Qiu Sheng. Analysis of Dewatering Technology for Large Foundation Pit of Xi'an North Railway Station. 铁道工程学报, 2013, 30(1): 105-109.
[1] GB 50021—2001,岩土工程勘察规范[S]. GB 50021—2001, Code for Investigation of Geotechnical Engineering [S].
[2] JGJ79—2002,建筑地基处理技术规范[S]. JGJ79—2002, Technical Code for Ground Treatment of Buildings [S].
[3] JGJ 120—99,建筑基坑支护技术规程[S]. JGJ 120—99, Technical Specification for Retaining and Protection of Building Foundation Excavations [S].
[4] JGJ/T 111—98,建筑与市政降水工程技术规范[S]. JGJ/T 111—98, Technical Code for Ground Water Lowering Engineering in Building and Municipal [S].
[5] 赵伟,刘玉波,王云宝.深基坑支护方案选择与施工技术[J].黑龙江水利科技,2006(3): 22-23. Zhao Wei, Liu Yubo, Wang Yunbao. Selection of Support Scheme and Construction Technology for Deep Foundation Pit [J]. Heilongjiang Science and Technology of Water Conservancy, 2006(3): 22-23.
[6] 刘均红,张保圆,冯超.地铁车站深基坑坑内降水方案设计[J].铁道勘察,2009(1): 85-87. Liu Junhong, Zhang Baoyuan, Feng Chao. Design of Scheme on Dewatering inside Deep Foundation Pit at Metro Station [J]. Railway Investigation and Surveying,2009(1): 85-87.
[7] 张志林,何运晏.国家大剧院深基坑地下水控制设计及施工技术[J].水文地质工程地质, 2005(3): 113-116. Zhang Zhiling, He Yunyan. Design and Construction Techniques of Controlling Ground Water in the Deep Foundation Pit of the National Grand Theatre [J]. Hydrogeology & Engineering Geology, 2005(3): 113-116.
[8] 施普德.井水量计算的理论与实践[M].北京:地质出版社,1977. Shi Pude. Theory and Practice of Well Water Calculation [M]. Beijing:Geosciences Press, 1977.
[9] 胡志军,张彬,周朋飞,等.北京地铁10号线奥森区间降水方案选择与实施[J].铁道建筑, 2006(11): 73-75. Hu Zhijun, Zhang Bin, Zhou Pengfei, etc. Precipitation Scheme Selection and Implementation for Beijing Metro Line 10 Orson Interval [J]. Railway Engineering, 2006(11): 73-75.
[10]张楠,胡鹏辉.紧邻既有铁路线深基坑的降水设计与沉降监测[J].铁道工程学报,2010(9): 1-4. Zhang Nan, Hu Penghui. Dewatering Design and Subsidence Monitoring for Deep Foundation Pit Close to Existing Railway Line [J]. Journal of Railway Engineering Society, 2010(9): 1-4.