Abstract:Research purposes:The line 3 of Kunming rail transit crosses the downtown of Kunming from east to west.The engineering geological condition,hydrogeologic condition and surrounding environment are complex. By using the comprehensive survey technologies of the engineering geological mapping,drilling,geophysical exploration,testing,in - situ tests,the engineering geological condition and the hydrogeologic condition of the deep foundation pit for the stations of the Line 3 of Kunming rail transit were investigated. The analysis and evaluation were made for the stability of the site,the structure style of the exterior - protected construction for the foundation pit,the drainage scheme,the anti -floating and anti - raising of pit base,the treatment of the base and the construction of foundation pit.
Research conclusions: (1) The Line 3 of the urban rail transit in Kunming crosses the Kunming downtown featured with the complicated and unfavorable engineering geological condition and hydrogeological condition,such as the multiple rock - soil layers,rich underground water,sandy soil liquefaction,karst,shallow natural gas,filling soil,soft soil,the special rock and soil and poor regional stability.(2) Based on the comprehensive analysis of the geological condition and surrounding environment of deep foundation pits,the open cut method was used for the foundation pit and the top-down method was used for the section where was limited locally by the transportation condition.(3) The diaphragm wall was available for the interior support and sealing up for the deep foundation pit in the basin with the support of the concrete and steel pipe. The drainage ditch and the collecting well were installed in the foundation pit along with the artificial pumping and draining. The mixing pile and filling were used for the pit base to meet the requirement of anti-float and anti-raising.(4) The the slope excavation could be conducted with the support of the soil nail wall and filling to the pit base for the foundation pit in the essentially level area because of its good engineering geological condition without development of underground water.
刘 伟;和佳良;杨文辉;代 伟. 昆明轨道交通 3 号线深基坑岩土工程勘察与评价[J]. 铁道工程学报, 2012, 29(10): 106-110.
LIU Wei,HE Jia - liang,YANG Wen - hui,DAI Wei. Geotechnical Engineering Investigation for Deep Foundation Pit of Line 3 of Kunming Rail Transit and Its Evaluation. 铁道工程学报, 2012, 29(10): 106-110.
Liu Chuanping,Jia Jian,Zheng Junxing.Design and Practice of a Deep Foundation Pit with Complex Boundary Conditions in Shanghai[J].Chinese Journal of Geotechnical Engineering,2010(S1) : 379.
Xu Zailiang,Meng Qingwen,Zhang Yongfu,etc. The Geotechnical Engineering Investigation of Tianjin Traffic Transfer Junction Center [J].Journal of Railway Engineering Society,2008(6) : 1-5.
Xu Anjun,Wang Jianhua,Ding Yongchun. Construction Technology for Deep Excavation of South Tibet Station of Shanghai Metro[J].Chinese Journal of Geotechnical Engineering,2006(S) : 1707-1713.
[6]李耀良,王建华,丁勇春.上海地铁明珠线二期西藏南路站地下连续墙施工技术[J].岩土工程学报,2006 (S) :1664-1672.
Xu Anjun.Wang Jianhua.Ding Yongchun.Diaphragm Construction Technology for Deep Excavation of South Tibet Station of Shanghai Metro[J].Chinese Journal of Geotechnical Engineering,2006(S) : 1664-1672.
[7]刘建航,候学渊.基坑工程手册[M].北京: 中国建筑工业出版社,1997.
Liu Jianhang,Hou Xueyuan.Handbook of Foundation Pit Engineering[M].Beijing: China Architecture & Building Press,1997.
Yang Youhai,Wang Jianjun,Wu Jinguang,etc. Informationized Construction Monitoring Analysis of Deep Foundation Pit for Qiutao Road Station of Hangzhou Metro[J].Chinese Journal of Geotechnical Engineering,2008( 10) : 1550-1554.