Abstract:Research purposes: High speed railway needs a very strict control of post - construction subgrade settlement.The post - construction subgrade settlemen mainly refers to the residual subgrade settlement after the track is laid. The design speed of the Shijiazhuang - Wuhan high - speed Railway is 350 km / h with the ballastless track. During the construction,the monitoring and research were done on the subgrade settlement in the tested section in order to research the scientificness of reinforcing subgrade.
Research conclusions:The pile + plate structure and CFG pile composite foundation was used for reinforcing the deep soft soil foundation along with the heap pre - loading. The settlement volume during construction was up to the 72% - 85% of the total settlement volume,so the post - construction settlement was effectively controlled. The vertical settlement of the foundation in the whole section was even and it met the demand of laying the ballstless track and proved the reinforcement measures were feasible.
赵 勇陈 占 徐红星. 高速铁路无砟轨道路基沉降监测和研究[J]. 铁道工程学报, 2012, 29(6): 45-49.
ZHAO Yong,CHEN Zhan,XU Hong - xing. Monitoring and Research on Subgrade Settlement of Ballastless Track of High -speed Railway. 铁道工程学报, 2012, 29(6): 45-49.
Guo Guangquan. Observation of Settlement and Deformation of Subgrade of Railway Passenger Dedicated Line [ J ] . Journal of Railway Engineering Society , 2007 ( 12 ): 153 - 157.
Chen Shanxiong , Song Jian , Zhou Quanneng , etc. Theory and Practice of High Speed Railway Subgrade Settlement Observation and Evaluation [ M ] . Beijing :China Railway Publshing House,2010.
[6] 铁建设[2004]157 号,京沪高速铁路设计暂行规定[S].
Railway Construction[2004]No. 157,Design Interim Provisions of the Beijing - Shanghai High - speed Railway [S].
[7] 铁建设函[2005]754 号,客运专线无碴轨道铁路设计指南[S].
Railway Construction Letter [2005] No. 754,Design Guidelines of Ballastless Track Passenger Dedicated Line [S].
The Fourth Survey and Design Institute of China Railway. General Design Rules of Wuhan - Guangzhou Passenger Dedicated Line[R]. Wuhan:The Fourth Survey and Design Institute of China Railways , 2006.
[10] 铁建设[2006]158 号,客运专线铁路无砟轨道铺设条件评估技术指南[S].
Railway Construction[2006]No. 158,Technical Guideline for Unballasted Track Laying Condition Assesment of Passenger Dedicated Railway Line[S].