|
|
CONSTRUCTION TECHNIQUE OF PRE-CASTING FOR PRE-STRESSED CONCRETE SIMPLE-SUPPORTED BEAM WITH LONG SPAN PRE- TENSIONED BROKEN-LINE |
HE Min-suo, MA Xin-an,CAO Xin-gang |
The First Engineering Bureau Group Co. Ltd of Chinese Railway |
|
|
Abstract Pre-stressed concreted simple-supported beam pre-casting with 24 m pre-tensioned broken-line reinforcement is a new type structure which is first adopted at home and one of the new technologies adopted on Qinghai-Tibet Railway,with high technical level,new construction technique and great construction difficulties. Based on its technological features and construction requirement, the techniques for pre-stressed concrete and the control value of durable concrete construction are well worth spreading to use and studying.
|
Received: 20 March 2004
|
|
|
|
|
|
|
|