|
|
Exploration on New Type of Catenary Fittings and Quality of Current Collection of Pantograph and OCS for 200km/h Electrified Railway |
LIU Li-rong, PAN Ying |
The Second Survey and Design Institute of China Railway, Chengdu, Sichuan 610031, China |
|
|
Abstract Research purposes: The purposes are to meet the requirement of quality of current collection of pantograph and OCS for 200km/h electrified railway in mountain area.
Research methods: The detailed introduction is given to different catenary suspension modes, application of accessories and materials quality for different sections under condition that the lowest height of catenary is 6330mm on Suining-Chongqing Railway. It shows the importance of adopting materials with high strength and good tenacity for catenary fittings and light and anti-vibration structure for high-speed railway.
Research results: The analysis is made for the test through test data. The contact force between pantograph and OCS is between 40~200 N. It shows new type fittings can meet the quality requirement of current collection of pantograph and OCS.
|
Received: 20 May 2006
|
|
|
|
|
[1] |
于万聚高速电气化铁路接触网[M].成都:西南交通大学出版社,2003.
|
[2] |
[德]KieBling, Puschmann, Schmieder.电气化铁道接触网[M].北京:中国电力出版社,2004.
|
[3] |
本书编委会.最新电气化铁道接触网规划、设计、施工实用全书[M].北京:中国电力出版社, 2004.
|
[5] |
铁道科学研究院,遂渝线200 km/h提速综合试验报告[R].2006.
|
[4] |
铁道科学研究院高速铁路技术研究总体组.高速铁路技术[M].北京:中国铁道出版社,2005.
|
|
|
|