Safe Management of the Blast Adjacent to Infrastructure |
YAN Qian-yin |
Lanzhou Branch, China Railway 20th Bureau Group Co.Ltd, Lanzhou, Gansu 730030, China |
|
|
Abstract Research purposes:With the blasting work for the phase 3 project of the special railway line to Xiabaipo Power Plan,t this paper tries to explain that the current concept on absolute safety can not ensure the safety of the blasting operation closely adjacent to the important infrastructures. For the safety, the systematic planning should be worked out and the safety measure should be taken.
Research conclusions:When the blasting work is carried out closely adjacent to the infrastructures like the railways, the safety management based on risks does not fit to current construction environment due to its lack of operability on the sites. The contractors are usually the creators of hazards, so the plans of disaster prevention is not only made in the bidding stage, but the most importance is to make it implemented in the construction phases. Only if the clients, the contractors and the owners of the infrastructures jointly undertake the obligation and responsibilities to work out and implement the plan of disaster prevention, can the occurrence of disaster be avoided and quick recovery from the disasters be realized.
|
Received: 09 January 2009
|
|
|
|
|
[ 1 ] 杨小礼. 铁路明洞行车安全等级的模糊评判[J]. 铁道工程学报, 2000(4): 66-69.
[ 2 ] Nancy G.Leveson. A New Approach To system Safety Engineering[J]. M.I.T Research Report, 2002(6): 8-63.
[ 3 ] Wolfgang Garatwa, GTZ. Dr. Christina Bollin. Disaster Risk Management, O.K.KOPIE Gmb H, 65719 Hofheim-Wallau, Eschborn, 2002.
[ 4 ] Henk Voogd. Disaster Prevention in Urban Environments[J]. European Journal of Spatial Development, 2004(12): 32-52.
[ 5 ] 康宁. 工程爆破中的飞石预防和控制[J]. 爆破, 1999, 16(1): 80-87 .
[ 6 ] 申茂夏, 郑平, 徐成光. 水利水电工程爆破技术新进展[J]. 广西水利水电, 2004(3): 27-31.
[ 7 ] 张兴赟. 敏感危险区石方开挖控制爆破[J]. 小水电, 2004, 116(2): 41-43.
|
|
|
|