铁道工程学报  2009, Vol. 26 Issue (3): 7-10    DOI:
Current Issue | Archive | Adv Search |
Multivariate Nonlinear Regression Analyses of Time Series Law to Subgrade Settlement of High-speed Railway Based on the Foundation of Layer-summation
HU Rong-guang
Guangxi Electric Power Industry Investigation Design and Research Institute, Nanning, Guangxi 530023, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech