Abstract Research purposes:Taking the deep foundation pit construction for Jinyilu Station of Tianjin metro as the background, the discussions are made on the engineering principles of churning jet pile and SMW pile and the quality control measures for them, and the summary is made on their applications in exterior-protected construction for the purpose of providing the reference to the exterior-protected construction of foundation pit in soft soil area.
Research conclusions:The research on the exterior -protected construction of foundation pit for Jinyilu Station of Tianjin metro shows SMW pile along with churning jet pile is feasible as the exterior -protected construction of foundation pit and is worth using widely. The H steel used in SMW pile can improve the pile strength and can be used again to save the cos.t However, the piling quality should be guaranteed, especially the pile strength and impermeability, to meet the construction requirements.
|
Received: 07 January 2009
|
|
|
|
|
[ 1 ] 刘建航, 侯学渊. 基坑工程手册[M]. 北京: 中国建筑工业出版社, 1997.
[ 2 ] 李玉芳. 浅谈旋喷桩在铁路桥梁基础加固中的应用[J]. 铁道工程学报 , 2007(5): 67-70.
[ 3 ] 孟凤朝. 深圳地铁大~科区间隧道水平旋喷桩施工技术[J].铁道工程学报, 2003(2): 1-4.
[ 4 ] 张丽军, 姚燕明, 等. S MW工法的实践与机理验证[J]. 铁道工程学报 , 2002(3): 96-99.
[ 5 ] 周江平, 彭雄志, 赵善锐. 高水利坡降下的沙层地基中高压旋喷桩的成桩效果及机理[J]. 勘察科学技术, 2003(5): 3-6.
[ 6 ] 路殿成, 张坤, 胡涛. 搅拌桩、旋喷桩在基坑围护工程中的应用[J]. 青岛理工大学学报, 2006(2): 126-129.
|
|
|
|