Research on the Upgrading Plan of Xiangtangxi Marshalling Station |
HOU Xiang-ju |
China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China |
|
|
Abstract Research purposes:Aiming at the problem that Xiangtangxi Marshalling Station in Nanchang railway hub is deficient in operation capacity, this paper systematically studies the upgrading plans of Xiangtangxi Marshalling Station, and puts forward the recommended plan though comparison of plans in economics, technology, traffic flexibility and operation capacity.
Research conclusions:Through the research on the upgrading plan of the marshalling station, it is decided to upgrade the up system of marshalling station into two-stage -four-yard and the down system into three-stage-three-yard by using level untwining reasonably with consideration of the numbers of freight train, train flow properties, flexibility of operation route and demands of transport development under condition of no way to adjust the existing layout largely. Therefore, the upgraded station can meet the near and long-term development demands and save the construction investment.
|
Received: 24 November 2008
|
|
|
|
|
[ 1 ] GB 50091—2006, 铁路车站及枢纽设计规范[S].
[ 2 ] 铁道第四勘察设计院.铁路工程设计技术手册?站场及枢纽[K]. 北京: 中国铁道出版社, 2004.
[ 3 ] TB 10062—1999,铁路驼峰及调车场设计规范[S].
[ 4 ] 蔡胜全, 罗江成. 重庆枢纽解编系统能力加强方案研究[J]. 铁道工程学报, 2007(4): 92-95.
|
|
|
|