铁道工程学报  2010, Vol. 27 Issue (3): 49-51    DOI:
Current Issue | Archive | Adv Search |
Measures for Closure of Main Arch of Dashengguan Yangtze Rive Bridge and Analyses of Monitoring Computation
HU Hui-yue
China Zhongtie Major Bridge Reconnaissance& Design Institute Co. Ltd, Hubei, Wuhan 430056,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech