铁道工程学报  2011, Vol. 28 Issue (10): 38-41    DOI:
Current Issue | Archive | Adv Search |
Countermeasure and Primary Engineering Geological Problems of Newly - built Ethiopian Railway
ZHANG Kun1,GUO Jv - bin2,LI Jian - qiang1
1. China Railway Eryuan Engineering Group Co. Ltd,Chengdu,Sichuan 610031,China; 2. Emei Campus,Southwest Jiaotong University,Emei,Sichuan 614202,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech