The Third Railway Survey and Design Institute Group Corporation. Report on the Variation from Ballast Track to Ballastless Track of the Four Segments of the Tianjin - Qinhuangdao Rail Line [R]. Tianjin: The Third Railway Survey and Design Institute Group Corporation,2009.
[3] 中国地震灾害防御中心. 津秦铁路客运专线工程场地地震安全性评价报告[R]. 北京: 中国地震灾害防御中心, 2009.
China Earthquake Disaster Prevention Center. The Seismic Safety Assessment Report of the Engineering Site of the Tianjin - Qinhuangdao Passenger Dedicated Rail Line[R]. Beijing: China Earthquake Disaster Prevention Center,2009.
[4] GB 50111—2006,铁路工程抗震设计规范( 2009 年版)[S].
GB 50111—2006,Code for Design of Railway Engineering ( 2009 edition) [S].
[5] TB 10621—2009,高速铁路设计规范( 试行) [S].
TB 10621—2009,Code for Design of High - speed Railway ( Trial) [S].
[6] GB 12897—2006,国家一、二等水准测量规范[S].
GB 12897—2006,Specifications for the First and Second Leveling [S].
[7] DZ/T 0154—95,地面沉降水准测量规范[S].
DZ/T 0154—95,Specifications for Standard Survey of the Land Subsidence [S].
[8] JGJ 8—2007,建筑变形测量规程[S].
JGJ 8—2007,Code for Deformation Measurement of Building and Structure [S].
[9] GBT/18314—2009,全球定位系统( GPS) 测量规范[S].
GBT/18314—2009, Specifications for Global Positioning System ( GPS) Surveys [S].
[10] TG/04—2009,铁路客运专线技术管理办法( 试行) ( 300 ~350 km/h 部分) [S].
TG/04—2009,The Ministry of Railways of the People’ s Republic of China. The Technical Management Criteria of the Passenger Dedicated Railway Line ( Trial) ( The 300 - 350km/h Part)[M]. Beijing: China Railway Publishing House,2010.
[11] 铁建设[2006]189 号,客运专线无碴轨道铁路工程测量暂行规定[S].
Railway Construction[2006] No. 189,Provisional Regulations on the Railway Engineering Survey for Ballastless Tracks of Passenger Dedicated Rail Line[S].
[12] 黄彦彬,乔登寿,黎亚平. 地震灾害对拟建兰渝铁路工程的影响及防治措施[J]. 铁道工程学报,2008( 12) :18 - 23.
Huang Yanbin, Qiao Dengshou, Li Yaping.Earthquake Disaster Impact on Proposed Lanzhou -Chongqin Railway and Prevention Measures [J].Journal of Railway Engineering Society, 2008( 12) : 18- 23.