Xie Yanqing, Zhang Jiang. Fuzzy Gray Matter -element Space Theory and Practical Application and Development - The Policy Decision Supporting System in Macro Complex System[J]. Engineering Science,2002( 11) : 57 - 66.
[6] 王卫刚,刘俊娥,刘敬严. 运用模糊综合评判法评价铁路工程承包风险[J]. 铁道工程学报, 2006( 2) : 87 - 91.
Wang Weigang, Liu Jun, Liu Jingyan. Fuzzy Comprehensive Evaluation to Risk of the Railway Project Contract[J]. Journal of Railway Engineering Society, 2006( 2) : 87 - 91.
[7] 纪嘉伦,李福志. 城市轨道交通线网规划方案综合评价指标体系研究[J]. 系统工程理论与实践,2004( 3) : 129 -133
Ji Jialun, Li Fuzhi. A Study on the Synthetic Evaluation Index System of Urban Rail Transit Line Network Planning Scheme[J]. Systems Engineering -theory & Practice, 2004( 3) : 129 - 133.
[8] 顾保南,方青青. 城市轨道交通路网规划的评价指标体系研究[J]. 城市轨道交通研究, 2000( 1) : 24 - 27.
Gu Baonan,Fang Qingqing. A Study on the Evaluation Index System of Urban Rail Transit Network Plan[J].Urban Mass Transit, 2000( 1) : 24 - 27.
[9] 王念念. 城市轨道交通规划线网综合评价研究[D]. 北京: 北京交通大学, 2007.
Wang Niannian. Research on the Integrative Evaluation of Urban Rail Transit Planning Network[D]. Beijing:Beijing Jiaotong University, 2007.
[10] 杜胜品,孔建益,熊玲. 城市轨道交通线网规划方案评价指标体系研究[J]. 武汉理工大学学报,2003( 6) : 841 -844.
Du Shengpin,Kong Jianyi,Xiong Ling. On Evaluation System of Urban Rail Transit Network Planning[J].Journal of Wuhan University of Technology,2003 ( 6) :841 - 844.