Abstract Research purposes:Heavy-haul railway is one of the main trends of railway development in China.The railway alignment is an extremely significant part in railway construction and it directly relates to the rationality of the construction scheme and decides the investment scale.Further more,the alignment of heavy haul railway has its unique characteristics. As the Zhangjiakou - Tangshan Railway is the major line of coal transportation in China in the new period,to find out the rational railway alignment is the basis of construction of Zhangjiakou - Tangshan Railway. This paper tends to analyze the characteristics of heavy - haul railway and the various factors that influence the alignment of heavy - haul railway and offer the reasonable principle and method for the railway alignment to make the alignment more scientific and suitable.
Research conclusions:The safety,energy-saving,construction investment,urban planning,environmental impact,topography and geology conditions,the comprehensive research is done on the alignment of the Zhangjiakou-Tangshan Railway to improve the construction scheme for obtaining the rationality in economics and technology, small environmental impact and best comprehensive benefits. The principle and method presented for the comprehensive alignment can offer the reference to the alignment design of haevy - haul railway and other railways.
|
Received: 26 March 2011
|
|
|
|
|
[1] 铁道第三勘察设计院集团有限公司. 张家口至唐山铁路预可行性研究[R].天津: 铁道第三勘察设计院集团有限公司,2008.
The Third Railway Survey and Design Institute Group Corporation. Pre - feasibility Study on the Railway from Zhangjiakou to Tangshan [R].Tianjin: The Third Railway Survey and Design Institute Group Corporation,2008.
[2] 铁道第三勘察设计院集团有限公司. 浦城至梅州铁路预可行性研究[R].天津: 铁道第三勘察设计院集团有限公司,2010.
The Third Railway Survey and Design Institute Group Corporation. Pre - feasibility Study on the Railway from Pucheng to Meizhou[R].Tianjin: The Third Railway Survey and Design Institute Group Corporation,2010.
[3] 铁道第三勘察设计院集团有限公司.沈阳至丹东客运专线预可行性研究 [R].天津: 铁道第三勘察设计院集团有限公司,2009.
The Third Railway Survey and Design Institute Group Corporation. Pre - feasibility Study on the Passenger Dedicated Railway from Shenyang to Dandong [R]. Tianjin: The Third Railway Survey and Design Institute Group Corporation,2009.
[4] 钱立新. 世界重载铁路运输技术的最新进展[J].机车电传动,2010(1) :3-7.
Qian Lixin.The World Latest Progress of Heavy Railway Transportation Technology[J].Electric Drive for Locomotives,2010(1) 3-7.
[5] 朱颖. 铁路选线理念的创新与实践[J].铁道工程学报, 2009(6) : 1-5.
Zhu Ying. Innovation and Practice on Railway Location Concept[J]. Journal of Railway Engineering Society, 2009(6) : 1-5.
[6] 铁道部第一勘测设计院。铁路工程设计技术手册线路[K].2 版. 北京: 中国铁道出版社,1994.
China Railway First Survey and Design Institute Group Ltd. Technical Manual for Design of Railway Engineering - route ( revised edition) [K].Beijing: China Railway Publishing House,1994.
[7] GB 50091—2006,铁路站场及枢纽设计规范[S].
GB 50091—2006,Code for Design of Railway Station and Terminal[S].
[8] GB 50090—2006,铁路线路设计规范[S].
GB 50090—2006,Code for Design on Railway Line [S].
[9] 杜宇本,蒋良文.大瑞铁路大保段主要工程地质问题及地质选线[J]. 铁道工程学报,2010(4) :23-27.
Du Yuben ,Jiang Liangwen. Main Problems in Engineering Geology and Alignment in Dali - Baoshan Section of Dali - Ruili Railway[J]. Journal of Railway Engineering Society,2010(4) : 23-27.
[10] 李翔. 铁路工程放射性影响评价方法研究[J]. 铁道工程学报,2010(8) :41-46.
Li Xiang. Study on Method for Assessing Radioactive Impact to Railway Engineering[J]. Journal of Railway Engineering Society,2010(8) : 41-46.
|
|
|
|