Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Quick Search  
  Adv Search
2008 Vol. 25, No. 2
Published: 15 February 2008

 
1 Discussion on the Counter-analysis of Soil Resistance Coefficient Ratio m
GAO Xi-liang
2008 Vol. 25 (2): 1-5 [Abstract] ( 2677 ) HTML (1 KB)  PDF  (461 KB)  ( 218 )
6 Probability Distribution of Measured Standard Penetration Test of Granite Residual Soil and Completely Rotten Soil
ZHANG Kun, GUO Ju-bin
2008 Vol. 25 (2): 6-8 [Abstract] ( 2511 ) HTML (1 KB)  PDF  (355 KB)  ( 206 )
9 Exploration on the Temporary Limiting Speed Design Scheme of CTCS
ZOU Shao-wen
2008 Vol. 25 (2): 9-12 [Abstract] ( 2555 ) HTML (1 KB)  PDF  (348 KB)  ( 246 )
13 Discussion about Relation between Riding Comfortableness and Transition Curve
BAI Bao-ying
2008 Vol. 25 (2): 13-16 [Abstract] ( 2562 ) HTML (1 KB)  PDF  (395 KB)  ( 161 )
17 Option of Speed Target Value of the Haerbin-Qiqihaer Inter-city Railway
WANG Xiu-li
2008 Vol. 25 (2): 17-20 [Abstract] ( 2532 ) HTML (1 KB)  PDF  (345 KB)  ( 134 )
21 Experimental Research on Mechanical Characteristics of Red Rock Filling for Subgrade of High-speed Railway
HU An-Hua, JIANG Guan-Lu, WANG Zhi-Meng, WEI Yong-Xing
2008 Vol. 25 (2): 21-25 [Abstract] ( 2568 ) HTML (1 KB)  PDF  (396 KB)  ( 169 )
26 Analysis of the Displacement Controlling Value of Large Load Pile Foundation Substitution Works
TU Qiang
2008 Vol. 25 (2): 26-30 [Abstract] ( 2636 ) HTML (1 KB)  PDF  (405 KB)  ( 204 )
31 Research on the Bearing Capacity of Single Cement Mixing Pile in Soft Soil Area
LIU Yan-wen
2008 Vol. 25 (2): 31-34 [Abstract] ( 2485 ) HTML (1 KB)  PDF  (402 KB)  ( 169 )
35 Research on the Integrity and Bearing Capacity of Column Pile for Subgrade
CHANG Ju-you, LIU Zhi-jun, ZHOU Qi-xiang
2008 Vol. 25 (2): 35-39 [Abstract] ( 2587 ) HTML (1 KB)  PDF  (421 KB)  ( 155 )
40 Design and Research on the Fuzhou-Xiamen Railway Bridge
CHEN Lie
2008 Vol. 25 (2): 40-42 [Abstract] ( 2409 ) HTML (1 KB)  PDF  (440 KB)  ( 192 )
43 Overall Design of Variable Width Large-span Continuous Beam in Turnout Area of Hanjiang Bridge for Xiamen-Shenzhen Railway
YAO Jun-sheng, XU Zhi-yan, REN Wei, CHEN Lie
2008 Vol. 25 (2): 43-46 [Abstract] ( 2543 ) HTML (1 KB)  PDF  (340 KB)  ( 187 )
47 Design and Study of Continuous Welded Rail on Bridge in the Small Radius Curve Section
GUO Li
2008 Vol. 25 (2): 47-49 [Abstract] ( 2695 ) HTML (1 KB)  PDF  (326 KB)  ( 173 )
50 Counter-analysis of Displacement of Support Structures in the F4 Fault of Wushaoling Tunnel
SUN Qi-qing, ZHAO Wan-qiang, GAO Feng, YU Yu, KUANG Liang
2008 Vol. 25 (2): 50-53 [Abstract] ( 4784 ) HTML (1 KB)  PDF  (371 KB)  ( 189 )
54 Analyses of the Sloughing of Tunnel Portal of Yichang-Wanzhou Railway and Its Treatment
ZHANG Min-qing, HUANG Hong-jian, MIAO De-hai, TIAN Si-ming
2008 Vol. 25 (2): 54-60 [Abstract] ( 2552 ) HTML (1 KB)  PDF  (770 KB)  ( 239 )
61 Resampling TEM Sounding Data by Time-dependent Filter Method
ZHANG Ji-ling, WENG Ai-hua
2008 Vol. 25 (2): 61-64 [Abstract] ( 2466 ) HTML (1 KB)  PDF  (333 KB)  ( 134 )
65 Dynamic Reactive Power Compensation in Railway Substation
WANG Hong-mei, GUO Jing-wu
2008 Vol. 25 (2): 65-68 [Abstract] ( 2480 ) HTML (1 KB)  PDF  (333 KB)  ( 141 )
69 Research on the Application of Digital Video Monitoring System in Railway
XIAO Kun
2008 Vol. 25 (2): 69-72 [Abstract] ( 2539 ) HTML (1 KB)  PDF  (368 KB)  ( 194 )
73 Discussion on Operation Mode of Integrated Supervisory Control System for Rail Communication
DAI Lin
2008 Vol. 25 (2): 73-76 [Abstract] ( 2511 ) HTML (1 KB)  PDF  (391 KB)  ( 238 )
77 Comparison and Selection of the Catenary Suspension Installed on the Platform Canopy without Post in Jinan Rail Station
WANG Guo-Bang, ZHAO Hong-yu, LUO Jian, DAI Lang-jie
2008 Vol. 25 (2): 77-79 [Abstract] ( 2528 ) HTML (1 KB)  PDF  (294 KB)  ( 209 )
80 Comprehensive Analysis of Track Joining Scheme of Release Line of Dalian Metro Depot
ZHANG Peng
2008 Vol. 25 (2): 80-83 [Abstract] ( 2540 ) HTML (1 KB)  PDF  (330 KB)  ( 330 )
84 Analysis of Design Thoughts on Tianjin Terminal
GUO Lin
2008 Vol. 25 (2): 84-88 [Abstract] ( 2675 ) HTML (1 KB)  PDF  (529 KB)  ( 212 )
89 Research on the Maximum Grade of Tianjin Underground Zhijing Line
TANG Wei-qiang, ZHANG Ji-qing
2008 Vol. 25 (2): 89-93 [Abstract] ( 2624 ) HTML (1 KB)  PDF  (407 KB)  ( 115 )
94 Research on the Inspection and Repair Technics of Straddled-type Monorail Depot
CAO Ke-fei
2008 Vol. 25 (2): 94-96 [Abstract] ( 2559 ) HTML (1 KB)  PDF  (580 KB)  ( 479 )
97 Choice of Maximum Running Speed of vehicles for Urban Mass Transit
XU De-xin
2008 Vol. 25 (2): 97-99 [Abstract] ( 2752 ) HTML (1 KB)  PDF  (265 KB)  ( 232 )
100 Establish the Technical Platform of Urban Mass Transit to Improve Its Design Technology
YU Chun-hua, MA Zhen-hai
2008 Vol. 25 (2): 100-103 [Abstract] ( 2514 ) HTML (1 KB)  PDF  (464 KB)  ( 154 )
  News
·Notice
More>>  
 
  Download
More>>  
 
  Links
  Beijing JIaotong University
  Journal of Southwest Jiaotong University
  China Association for Science and Technology
  National Library of China National Digital Library of China
  China Railway Society
  China Railway Group Limited
More>>  
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech