青藏铁路多年冻土区施工技术方案的制定

  • 王金宽
作者信息 +

WORK OUT CONSTRUCTION TECHNOLOGY SCHEMES FOR MULTI-YEAR TUNDRA OF QING-ZANG RAILWAY

  • WANG Jin-kuan
Author information +
文章历史 +

摘要

青藏铁路要通过550 km的多年冻上带.其中昆仑山隧道是全线最长的冻上隧道.冻土区域广阔.工程艰苦.技术难度大根据冻上不同的稳定程度.可采用不同的设计原则.本文阐述了几种设计原则.并研究制定了有关路基施工、桥涵施工、隧道施工等方面的施工方案

Abstract

The Qing-Zang Railway should be constructed passing through 550 km multi-year tundra ,including the Kunlunshan Tunnel which is the longest tunnel with frozen soil in the whole railway line. Due to the wide range of the tundra,the construction works arc very difficult and the construction technologies are very complex. Different design principles may be adopted according to different degree of stability of the tundre. The paper expounds several design principles,research and work out several construction schemes concerned with the construction of subgrade,bridge and culvert,tunnel, etc.

关键词

青藏铁路 / 多年冻上区 / 施工技术

Key words

Qing-Zang Railway / multi-year tundra / construction technology

引用本文

导出引用
王金宽. 青藏铁路多年冻土区施工技术方案的制定[J]. 铁道工程学报, 2002, 19(3): 67-69
WANG Jin-kuan. WORK OUT CONSTRUCTION TECHNOLOGY SCHEMES FOR MULTI-YEAR TUNDRA OF QING-ZANG RAILWAY[J]. Journal of Railway Engineering Society, 2002, 19(3): 67-69
中图分类号: P641   

PDF(97 KB)

2706

Accesses

0

Citation

Detail

段落导航
相关文章

/