Research on the Construction Deformation Characteristics of Large Span Metro Station in Hard Rock Area
HAN Kan1,SI Xiao - dong2
1. Northwest Research Institute Co. Ltd of C. R. E. C, Lanzhou, Gansu 730000, China; 2. Shandong Zhengyuan Construction Engineering Co. Ltd,Jinan,Shandong 250014,China
Abstract:Research purposes : Qingdao Hualoushan Road Metro Station is in slightly weathered rock,on the both ends the composite rock bolting and shotcrete and suspending pile supporting modes open excavation method is used,on the middle section three - bench seven - step excavation method and blasting construction are used. Taking the station project as the background,the deformation law of main station and the surrounding environment was studied by in - situ monitoring test,the construction deformation characteristics of large span metro station in hard rock area were analyzed, the deformation rules were summarized,to provide the reference for the similar engineering construction.
Research conclusions : ( 1 ) The surface settlement of composite rock bolting and shotcreting section is smaller than suspending pile supporting, the surface subsidence of initial excavation increases fast, and tends to be stable with excavation to floor position. The maximum settlement of the open excavation section is smaller than the subsurface excavation section. (2) In the same depth position,the anchor force of composite rock bolting and shotcrete section is smaller than suspending pile supporting section. Deep horizontal displacement of suspending pile was 11 inverted trapezoidal" distribution. (3) In the subsurface tunnel,vault settlement and convergence mainly occur in three stages, namely the excavation stage of the upper bench and on the left and right of the middle bench,and begin to slow and steady with excavation of lower bench. (4) The research results can be applied to the construction field of hard rock and large span metro station.
韩侃,司小东. 硬岩地区大跨度地铁车站施工变形特性研究[J]. 铁道工程学报, 2015, 32(7): 94-99.
HAN Kan1,SI Xiao - dong2. Research on the Construction Deformation Characteristics of Large Span Metro Station in Hard Rock Area. 铁道工程学报, 2015, 32(7): 94-99.
PECK R. B. Deep Excavation and Tunneling in Soft Ground [ C ]//Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering. Mexico: [s. n. ],1969:225 -290.
LONG M. Database for Retaining Wal and Ground Movements Due to Deep Excavations [ J ]. Journal of Geotechnical and Geoenvironmental Engineering, ASCE,2001 (33) :03 -224.
[5]
MOORMANN C. Analysis of Wall and Ground Movements Due to Deep Excavations in Soft Soil Based on a New Worldwide Database [ J ]. Soils and Foundations ,2004 (1) ;87 -98.
[6]
Zhong W. Wang, Charles W. W. Ng,and Guo B. Liu. Characteristics of Wall Deflections and Ground Surface Settlements in Shanghai [ J ]. Canadian Geotechnical Journal,2005 (5) ;1243 -1254.
Wei Gang. Selection and Distribution of Ground Loss Ratio Induced by Shield Tunnel Construction [ J ]. Chinese Journal of Geotechnical Engineering, 2010(9): 1354-1361.
Ren Jianxi,Feng Xiaoguang,Liu Hui,etc. Research on the Deformation Law of Supporting Structure for Deep Foundation Pit of Metro Station [ J ]. Journal of Railway Engineering Society ,2009(3) ;89 -92.
[3]
OUC Y’HSIEH P G,CHIOU D C . Characteristics of Ground Surface Settlement during Excavation [ J ]. Canadian Geotechnical Journal,993(5) ;758 -767.
CLOUGH G W,OROURKE T D. Construction Induced Movements of in Situ Walls[C]// ASCE Conference on Design and Performance of Earth Retaining Structures Special Publication No. 25. New York: [s. n. ],1990: 439 -470.
[7]
孙钧,侯学渊.地下结构[M].北京:科学出版社, 1988.
Hu Qunfang, Huang Hongwei. Analysis and Monitoring on Shield Tunneling under Existing Adjacent Tunnel [J ] . Chinese Journal of Geotechnica Engineering, 2006(1) ;42 -47.