Research purposes: The Pinghu South-Yantian Port Railway, located in Longgang and Yantian districts of Shenzhen, primarily handles the container transportation for Yantian Port’s sea-rail intermodal operations. Due to the low technical standards of the existing line, it has become a bottleneck constraining the capacity of the Pingyan transshipment system and it's necessary to enhance the capacity of the Pinghu South-Yantian Port Railway. The urbanization level along the Pinghu South-Yantian Port Railway is high, making the reconstruction of the existing line a complex task with many controlling factors. This paper primarily studies the reconstruction plans for the Pinghu South-Yantian Port Railway, exploring the research approach and principles for reconstructing existing lines in developed areas. Research conclusions: (1) Although the underground double-track scheme along the existing route has increased investment, the new double- track standard raised to 120 km/h can improve the efficiency of goods assembly and distribution. (2) considering the high level of urbanization, dense population, and extremely high urban land development intensity in Shenzhen, along with numerous controlling factors and extremely complex construction environment within the route, New double-track plan for underground construction along existing channels uses a tunnel through the urban area, which can reduce the impact on the city, save land resources, and align with urban planning and detailed project planning.(3)The research recommends adopting the new double- track plan along the existing route.(4) The results of this study are applied to the survey and design of the the Pinghu South-Yantian Port Railway renovation plan, which is consistent with the project feasibility study approval plan.
ZHANG Jiangtao. , {{custom_author.name_en}}et al.
Research on the Reconstruction Plan of Pinghu South-Yantian Port Railway[J]. Journal of Railway Engineering Society, 2024, 41(2): 11-15
[1] 中铁第四勘察设计院集团有限公司.改建铁路深圳平湖南至盐田港铁路改造工程可行性研究[R].武汉:中铁第四勘察设计院集团有限公司,2022. China Railway Siyuan Survey and Design Group Co. Ltd. Feasibility Study on the Reconstruction Project of Pinghu South-Yantian Port Railway[R].Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd, 2022. [2] TB 10098—2017,铁路线路设计规范[S]. TB 10098—2017,Code for Design of Railway Line[S]. [3] 易思蓉. 铁路选线设计(第四版) [M].成都:西南交通大学出版社,2017. Yi Sirong.Principles of Railway Location and Design (Fourth Edition) [M].Chengdu: Southwest Jiaotong University Press,2017. [4] 杨元明. 既有铁路扩能改造若干问题探讨[J].铁道工程学报,2010(12):1-4. Yang Yuanming.Discussion on Problems in Upgrading of Existing Railway Line[J]. Journal of Railway Engineering Society,2010(12):1-4. [5] 左波祥. 兰新通道嘉峪关及嘉峪关南站扩能改造方案研究[J].铁道运输与经济,2020(7):45-49. Zuo Boxiang.Renovation Plan for Jiayuguan and Jiayuguan South Station of Lanzou-Urumqi Railway Corridor[J].Railway Transport and Economy, 2020(7):45-49. [6] 周世林. 浅谈既有线扩能提速改造建设方案[J].铁道工程学报,2010(10):41-44. Zhou Shilin.Discussion on Upgrading Scheme of Existing Railway Line[J].Journal of Railway Engineering Society, 2010 (10):41-44. [7] 李敬伟. 广大单线铁路扩能改造方案研究[J].铁道运输与经济,2020(6):12-16. Li Jingwei.A Study on the Reconstruction Plan of the Guangtong-Dali Single Track Railway[J].Railway Transport and Econnmy,2020(6):12-16.