Abstract:Research purposes: By comprehensive research for Manning city and industry planning of Beibu Bay economic zone,general layout of terminal and arrangement of railway construction in the Beibu Bay economic developing zone fit for the economic development of Guangxi municipality are put forward.
Research methods: The comprehensive analysis and research has been performed of general layout of terminal and arrangement of railway construction in the Beibu Bay economic developing zone as per urban planning,industry planning and present state of terminal and railway network planning of Manning city and Beibu Bay economic zone.
Research Conclusions: It is a natural demand for the economic development in Beibu Bay Economic Zone,construction of city complex and productive capacity of railway transportation to do the comprehensive research on the general layout of Manning Terminal and overall arrangement of railway construction in Beibu Bay Economic Zone. It is decided finally Manning Terminal is linked with three main railway lines and 3 intercity railway lines to 6 travel directions to form a terminal pattern with loop corridor for passenger traffic and”T" corridor dominated by Southern Loop Line for freight traffic .
高丰农,龙顺海. 南宁枢纽总图与北部湾经济区铁路建设布局的综合研究[J]. 铁道工程学报, 2007, 24(6): 71-74.
GAO Feng-nong,LONG Shun-hai. Comprehensive Research on the General Layout of Manning Terminal and Overall Arrangement of Railway Construction in Beibu Bay Economic Zone. 铁道工程学报, 2007, 24(6): 71-74.