Abstract:The insuf ficient buried depth of bridg e fo undation is the fi rst ca use of bridg e disasters due to f lood. This paper analyses the mechanisms of scouring s which creat the insufficient founda tion, propese the cont rol principles and analyses the adv antag es and shortages of the protected methods w hich contain the riprap.
阚 译,王 群,林桂宾. 浅基形成机理及防治措施[J]. 铁道工程学报, 1998, 15(3): 44-50.
KAN Yi WANGQun LIN Guibun. MECHANISM OF INSUFFICIENT BRIDGE FOUNDATION AND ITS CONTROL METHODS. Journal of Railway Engineering Society, 1998, 15(3): 44-50.
1 阚译,余云杰.郑州黄河新桥防护研究报告[M ]. 1996
2 康笃材,阚译,刘进运.京广线郑州黄河大桥傍岸冲刷防护试验研究报告[ R]. 1997
3 Ka n Yi, Kong Ducai. Scour of Riv er Beds ar ound Bridg e Pier s a nd Abutments by St ream Flow in Curv ed Reaches [ R]. Pro c. o f the I SRS, 1981, China