Abstract:This paper describes the characteristics of the construction technique of floating plate ballast bed for subway at home and abroad and sums up the experience for the reference to the similar construction technique based on the construction technique of Floating plate ballast bed with continuous-casting in place- metal elastic buffer in a double-tracked horseshoe-shaped tunnel of Shengzheng subway.
唐俊,程桂芝. 连续-现浇-金属弹簧隔振器式浮置板道床施工研究[J]. 铁道工程学报, 2004, 21(1): 109-112.
TANG Jun, CHENG Gui-zhi. CONSTRUCTION TECHNIQUE OF FLOATING PLATE BALLAST BED WITH CONTINUOUS-CASTING IN PLACE-METAL ELASTIC BUFFER FOR URBAN RAIL. Journal of Railway Engineering Society, 2004, 21(1): 109-112.