Abstract:Research purposes: The Rayleigh wave tests were done to the 14 transition sections of the 7 bridges of the Nanjing-Qidong existing railway to evaluate the bearing capacity of the subgrade in the transition section for providing the basis for reinforcing the subgrade in the transition section.
Research conclusions: The 30 cm thick Rayleigh wave weighted average method retains the feature of testing in-situ original data, and the comparative evaluation to the transition section is easily to be made with this method. The statistics of the tested data indicates that the change regulation of the wave velocity of the subgrade in the transition section along the depth is of first decrease and then increase. The bearing capacity of the 0-1.2 m deep subgrade can not meet the requirements of raising speed, so this subgrade needs to be reinforced severely. The bearing capacity of the half of the 1.2-2.4 m deep subgrade can meet the requirement, so the targeted reinforcement should be conducted. The bearing capacity of 2.5 m below subgrade (embankment) can meet the almost all requirement, so it needs no reinforcement.
[1] 范云,汪英珍. 瞬态瑞利波技术在铁路既有线路基基床质量评价中的应用[J]. 铁道标准设计,2008(1):7-10 Fan Yun, Wang Yingzhen. Transient Rayleigh Wave Technology in the Existing Railway Line Quality Evaluation Bedding [J]. Railway Standard Design,2008(1): 7-10.
[2] 李志华,潘瑞林. 路基稳定性无损检测方法技术研究[J]. 铁道工程学报,2007(2): 28-31. Li Zhihua , Pan Ruilin. The Roadbed Stability of Non-destructive Testing Methods Study [J]. Journal of Railway Engineering Society , 2007(2): 28-31.
[3] 白朝旭,刘洋,王典. 瑞雷波测试技术在岩土工程中的应用研究[J].地球物理学进展, 2007(6): 1959-1965 Bai Chaoxu, Liu Yang, Wang Dian. Rayleigh Wave Testing Techniques in Geotechnical Engineering [J]. Progress in Geophysics, 2007(6): 1959-1965.
[4] 李占林.瞬态瑞雷波法评价既有线路基加固效果的应用[J].路基工程,2007(4): 164-165. Li Zhanlin. Transient Rayleigh Wave Method of the Existing Lines Based Reinforcement Effect of the Application [J]. Subgrade Engineering, 2007(4): 164-165.
[5] 吴迪,张涛,刘广亮,等. 瑞利波勘探原理及应用实例[J]. 地质装备,2009(5): 26-29. Wu Di, Zhang Tao, Liu Guangliang, etc. Rayleigh Wave Exploration Principle and Application Examples [J].Geological Equipment, 2009(5): 26-29.
[6] 铁科技[2008] 222号,铁路200-250 km/h既有线技术管理办法[S]. Railway Science[2008] No.222, The Existing Lines 200-250 km/h Railway Technology Management Approach [S].
[7]刘建新. 瞬态瑞利波技术检测铁路既有线路基基床质量[J]. 铁道勘察,2010(1): 46-48. Liu Jianxin. Bedding Transient Rayleigh Wave Detected by the Existing Railway Line Quality [J]. Railway Survey, 2010(1): 46-48.