Analysis of Error Composition and Weight Value of Ballastless Track
Journal of Railway Engineering Society
2010 Vol.27 (7): 20-24
[Abstract]
(2503)
1
[HTML 1 KB]
[PDF 148 KB]
(114)
25
CHEN Xiao—Ping,WANG Ping,ZHANG Yao
The Reasonable Stiffness of Ballastless Track Turnout of 250 km/h Passenger Dedicated Line
Journal of Railway Engineering Society
2010 Vol.27 (7): 25-28
[Abstract]
(2588)
1
[HTML 1 KB]
[PDF 120 KB]
(174)
38
LI Ming—hua,WANG Hui—qian,CAI Li—ping
Observation and Analysis of Settlement of Transition Section between Railway and Bridge of Shanghai—Nanjing Intercity Railway
Journal of Railway Engineering Society
2010 Vol.27 (7): 38-41
[Abstract]
(2530)
1
[HTML 1 KB]
[PDF 415 KB]
(140)
55
PENG Feng,LIU Guang—jun
Research on Sleeve—valve—pipe Grouting Technology for Reinforcing the Pearl River Dam Underpassed by Shiziyang Tunnel
Journal of Railway Engineering Society
2010 Vol.27 (7): 55-59
[Abstract]
(2595)
1
[HTML 1 KB]
[PDF 362 KB]
(175)
60
CHEN Zhl.YU Hua—wei
Prevention of Through Crack in Secondary Lining of Railway Mountain Tunnel
Journal of Railway Engineering Society
2010 Vol.27 (7): 60-63
[Abstract]
(2581)
1
[HTML 1 KB]
[PDF 118 KB]
(267)
86
YANG Feng
Study on Impact of Appreciation of RMB on International Engineering Projects
Journal of Railway Engineering Society
2010 Vol.27 (7): 86-90
[Abstract]
(2500)
1
[HTML 1 KB]
[PDF 532 KB]
(111)
91
WANG Feimeng
The Practice and Thinking on Professionalization of Project Manager
Journal of Railway Engineering Society
2010 Vol.27 (7): 91-95
[Abstract]
(2568)
1
[HTML 1 KB]
[PDF 770 KB]
(113)
1
WEI Zhou-quan
Study on Scheme for Reconstruction of Baotou-Xi'an Railway Corridor
Journal of Railway Engineering Society
2010 Vol.27 (6): 1-4
[Abstract]
(2557)
1
[HTML 1 KB]
[PDF 263 KB]
(273)
14
SHI Tie, GUAN Xiao-pin
Research on Traffic Organization of Existing Railway Lines under the Condition of PDL Network
Journal of Railway Engineering Society
2010 Vol.27 (6): 14-17
[Abstract]
(2552)
1
[HTML 1 KB]
[PDF 663 KB]
(193)
18
WANG Sen-rong
Study on Structural Design of Double-block Blab Ballastles Track and Continuous Reinforced Concrete Pavement
Journal of Railway Engineering Society
2010 Vol.27 (6): 18-22
[Abstract]
(2784)
1
[HTML 1 KB]
[PDF 705 KB]
(316)
32
HAO Yong-sheng
Application of Single-acting Double-tube Core-drilling Technique in Unconsolidated and Fracture Strata
Journal of Railway Engineering Society
2010 Vol.27 (6): 32-35
[Abstract]
(2771)
1
[HTML 1 KB]
[PDF 510 KB]
(310)
48
LAI Zi-hui
Methods for Calculation of Ultimate Bearing Capacity of Crushed Stone Pile
Journal of Railway Engineering Society
2010 Vol.27 (6): 48-50
[Abstract]
(2598)
1
[HTML 1 KB]
[PDF 972 KB]
(202)
55
WU Ke-jian
Research on the Recreation and Practice of Ballastless Track Technology
Journal of Railway Engineering Society
2010 Vol.27 (6): 55-60
[Abstract]
(2752)
1
[HTML 1 KB]
[PDF 609 KB]
(322)
70
ZHANG Ying-cai
Technology for Construction of Hanguguan Tunnel Under-passing New Loess Gulch
Journal of Railway Engineering Society
2010 Vol.27 (6): 70-73
[Abstract]
(2581)
1
[HTML 1 KB]
[PDF 339 KB]
(113)
74
MA Tao
Research on Treatment Technology for Krast Cave with Abundant Ground Water in Tunnel Engineering
Journal of Railway Engineering Society
2010 Vol.27 (6): 74-78
[Abstract]
(2580)
1
[HTML 1 KB]
[PDF 1076 KB]
(304)
79
ZHOU Fan
Choice and Application of Electric Section Insulator of Overhead Contact Wire for Datong-Xi'an Passenger Dedicated Line
Journal of Railway Engineering Society
2010 Vol.27 (6): 79-82
[Abstract]
(2705)
1
[HTML 1 KB]
[PDF 511 KB]
(176)
83
CHEN Wei
Scheme for Transiting Contact Wire from Rigid to Flexible Suspension for Line 9 of Shanghai Urban Rail Transit
Journal of Railway Engineering Society
2010 Vol.27 (6): 83-86
[Abstract]
(2682)
1
[HTML 1 KB]
[PDF 647 KB]
(247)
91
LI Kang-yan, ZHOU Fan
Research on Design of Power Supply and Distribution System for Beijing South Railway Station
Journal of Railway Engineering Society
2010 Vol.27 (6): 91-97
[Abstract]
(2534)
1
[HTML 1 KB]
[PDF 489 KB]
(245)
115
HUANG Yong-liu
Influence of Intermediate Station Layout Form of Intercity Railway on Train Interval
Journal of Railway Engineering Society
2010 Vol.27 (6): 115-118
[Abstract]
(2613)
1
[HTML 1 KB]
[PDF 268 KB]
(92)
1
LIU Sheng-chuan, CAO Yuan
Research on Settlement Law of Soft Soil Subgrade of New Railway
Journal of Railway Engineering Society
2010 Vol.27 (5): 1-3
[Abstract]
(2576)
1
[HTML 1 KB]
[PDF 350 KB]
(168)
9
WANG Qing-bo, JIANG Zi-qing, SI Dao-lin
Analysis of Technical Problems Related to Longitudinal Slab Ballastless Track on Bridge
Journal of Railway Engineering Society
2010 Vol.27 (5): 9-13
[Abstract]
(2822)
1
[HTML 1 KB]
[PDF 420 KB]
(160)
30
WANG Wei-ning, ZHANG Li-ying
Technology for Synchronous Jacking-in Steel Girder on Multiple Spots and Quality and Safety Control
Journal of Railway Engineering Society
2010 Vol.27 (5): 30-34
[Abstract]
(2611)
1
[HTML 1 KB]
[PDF 546 KB]
(199)
54
SHAO Shuang-xiu
Technique for Construction of Heluoshan Tunnel in Water-rich Stratum
Journal of Railway Engineering Society
2010 Vol.27 (5): 54-57
[Abstract]
(2583)
1
[HTML 1 KB]
[PDF 327 KB]
(155)
1
JIN Zhi-hua
Discussion on Alignment of Changting-Yongcan-Quanzhou Railway
Journal of Railway Engineering Society
2010 Vol.27 (4): 1-4
[Abstract]
(2617)
1
[HTML 1 KB]
[PDF 455 KB]
(145)
5
HUANG Bo, SHI Jun
Study on Alignment Schemes for Upgrading Existing Track and Construction of Newly-built Track in Jinchengjiang-Duyun Section of Guizhou-Guangxi Railway
Journal of Railway Engineering Society
2010 Vol.27 (4): 5-9
[Abstract]
(2575)
1
[HTML 1 KB]
[PDF 468 KB]
(104)
19
HE Gang, JIANG Chu-sheng
Analysis of Uncertainty of Slope Rock-soil Engineering and Countermeasure
Journal of Railway Engineering Society
2010 Vol.27 (4): 19-22
[Abstract]
(2558)
1
[HTML 1 KB]
[PDF 270 KB]
(93)
23
DU Yu-ben, JIANG Liang-wen
Main Problems in Engineering Geology and Alignment in Dali-Baoshan Section of Dali-Ruili Railway
Journal of Railway Engineering Society
2010 Vol.27 (4): 23-28
[Abstract]
(2659)
1
[HTML 1 KB]
[PDF 904 KB]
(210)
35
JIANG Chu-sheng, ZHAO Xiao-yan, LI Qing-hai, HE Gang
Discussion on Design Theory on Joint Use of Pile and Soil-nailing or Retaining Walls
Journal of Railway Engineering Society
2010 Vol.27 (4): 35-39
[Abstract]
(2647)
1
[HTML 1 KB]
[PDF 242 KB]
(119)
107
LI Jia-feng
Planning for Railway Logistics Center in Manzhouli
Journal of Railway Engineering Society
2010 Vol.27 (4): 107-111
[Abstract]
(2445)
1
[HTML 1 KB]
[PDF 736 KB]
(184)
112
PENG Wen-sheng
Research on the Plane Layout of Xinfengzhen Marshalling Station for Upgrading
Journal of Railway Engineering Society
2010 Vol.27 (4): 112-116
[Abstract]
(2515)
1
[HTML 1 KB]
[PDF 390 KB]
(159)