Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "U23":
13 HE En-huai
  APPLICATION OF CHANNEL GIRDERS IN PROJECT OF URBAN RAIL TRANSIT
    Journal of Railway Engineering Society   2003 Vol.20 (2): 13-16 [Abstract] (2591) 1 [HTML 1 KB] [PDF 161 KB] (340)
48 GAN Kun-rong
  METHOD OF STABILITY ANALYSIS ON SURROUNDING ROCKS OF UNDERGROUND WORKS: PROBLEMS AND CONSIDERATIONS
    Journal of Railway Engineering Society   2003 Vol.20 (1): 48-52 [Abstract] (2456) 1 [HTML 1 KB] [PDF 187 KB] (419)
53 WANG An-long
  DRILLING OCCLUSIVE PILES-NEW STYLE OF METRO PROTECTING STRUCTURE
    Journal of Railway Engineering Society   2003 Vol.20 (1): 53-59 [Abstract] (2546) 1 [HTML 1 KB] [PDF 281 KB] (248)
58 FANG Jun-bo,GUO Lei
  PRELIMINARY DISCUSSION ON ALLOCATION OF CONSTRUCTION MA- CHINERY DURING CONSTRUCTING SUBWAY'S SECTION BY USING MIN- ING METHOD
    Journal of Railway Engineering Society   2002 Vol.19 (2): 58-60 [Abstract] (2542) 1 [HTML 1 KB] [PDF 131 KB] (84)
61 GAO Ming
  RESEARCH ON NATIONALIZATION OF THE FITTINGS OF RIGID CONTACT LINE APPLIED FOR MONORAIL URBAN TRACK TRANSPORT
    Journal of Railway Engineering Society   2002 Vol.19 (2): 61-65 [Abstract] (2546) 1 [HTML 1 KB] [PDF 149 KB] (110)
66 LIU Ding-hui
  EXPLORATION ON CONSTRUCTION MODEL OF COMMUNICATION SYS- TEM FOR URBAN RAIL TRANSIT
    Journal of Railway Engineering Society   2002 Vol.19 (2): 66-67 [Abstract] (2503) 1 [HTML 1 KB] [PDF 110 KB] (187)
110 LIU Ge-zheng,ZHU Jian-zhang
  PRELIMINARY DISCUSSION ON DESIGN PARAMETER INSIDE OF ROOM FOR AIR CONDITIONING IN SUMMER SEASON AT SHENZHEN SUBWAY
    Journal of Railway Engineering Society   2002 Vol.19 (2): 110-113 [Abstract] (2566) 1 [HTML 1 KB] [PDF 185 KB] (183)
44 ZHANG Pei-zhu
  EXPLORATION ON PROBLEMS CONCERNED WITH EXPRIENCES FOR DESIGN OF SUBWAYS
    Journal of Railway Engineering Society   2001 Vol.18 (4): 44-46 [Abstract] (2547) 1 [HTML 1 KB] [PDF 150 KB] (356)
47 GAO Shu-feng
  DISCUSSION ON TECHNOLOGY FOR CONNECTING NEWLY BUILT STRUCTURE TO PRISTINE STRUCTURE IN REBUILDING OF TIANJIN SUBWAY
    Journal of Railway Engineering Society   2001 Vol.18 (4): 47-49 [Abstract] (2548) 1 [HTML 1 KB] [PDF 142 KB] (170)
50 DIAO Tian-xiang, FANG Jun-bo
  APPLICATION OF FABRIC CONCRETE FOR SELF-WATERPROOF OF STRUCTURE IN CONSTRUCTION OF SUBWAY STATIONS
    Journal of Railway Engineering Society   2001 Vol.18 (4): 50-53 [Abstract] (2480) 1 [HTML 1 KB] [PDF 160 KB] (98)
54 WANG Li-gang
  ANALYSIS ON CONTROL OF ENGINEERING COST FOR SUBWAYS
    Journal of Railway Engineering Society   2001 Vol.18 (4): 54-58 [Abstract] (2476) 1 [HTML 1 KB] [PDF 143 KB] (516)
59 WANG Yin-fu, LEI Zhi-hou
  EXPLORATION ON ORGANIZATION OF TRAIN OPERATION FOR URBAN RAIL TRANSIT
    Journal of Railway Engineering Society   2001 Vol.18 (4): 59-63 [Abstract] (2549) 1 [HTML 1 KB] [PDF 204 KB] (535)
64 NI Feng-chun
  URBAN LIGHT-RAIL TRANSIT AND NEW TRAFFIC SYSTEM IN EURAPE URBAN LIGHT-RAIL TRANSIT AND NEW TRAFFIC SYSTEM IN EUROPE
    Journal of Railway Engineering Society   2001 Vol.18 (4): 64-66 [Abstract] (2509) 1 [HTML 1 KB] [PDF 194 KB] (226)
24 LI Hong
  TRACK TRANSPORT IN AMERICAN CITIES
    Journal of Railway Engineering Society   2001 Vol.18 (3): 24-26 [Abstract] (2535) 1 [HTML 1 KB] [PDF 124 KB] (151)
30 TAN Jing
  DEVELOPING RAIL TRANSIT TO PROMOTE URBAN SUSTAINABLE DEVELOPMENT
    Journal of Railway Engineering Society   2001 Vol.18 (3): 30-32 [Abstract] (2499) 1 [HTML 1 KB] [PDF 136 KB] (188)
90 ZHU Zheng-qing, LIU Peng
  ENVIRONMENT EVALUATION OF NOISE POLLUTION FOR URBAN RAIL TRANSIT AND ITS PROTECTIVE COUNTERMEASURES
    Journal of Railway Engineering Society   2001 Vol.18 (2): 90-92 [Abstract] (3181) 1 [HTML 1 KB] [PDF 160 KB] (179)
76 GAO Shu-feng
  DISCUSSION ON HORIZONTAL FREEZING CONSOLIDATION TECHNOLOGY APPLIED IN TIANJIN SUBWAY ACROSS ZIYA RIVER
    Journal of Railway Engineering Society   2001 Vol.18 (1): 76-79 [Abstract] (2476) 1 [HTML 1 KB] [PDF 229 KB] (348)
80 ZHAO Bao-qiang
  PRELIMINARY DISCUSSION OF SEVERAL PROBLEMS ON WATER PROOFING ENGINEERING OF CERTAIN STATION IN NO.1 LINE OF GUANGZHOU SUBWAY
    Journal of Railway Engineering Society   2001 Vol.18 (1): 80-82 [Abstract] (2526) 1 [HTML 1 KB] [PDF 199 KB] (83)
32 LI Hong
  COMPREHENSIVE DESCRIPTION OF HEAVY HAUL RAILWAYS ABROAD
    Journal of Railway Engineering Society   2000 Vol.17 (4): 32-34 [Abstract] (2466) 1 [HTML 1 KB] [PDF 100 KB] (569)
22 QU Xiao-hui
  EXPLORATION ON DRIVING COMMAND FOR JING-HU HIGH-SPEED RAILWAY
    Journal of Railway Engineering Society   2000 Vol.17 (2): 22-26 [Abstract] (2500) 1 [HTML 1 KB] [PDF 150 KB] (222)
91 MA Hai- jun,DU Mei-hong
  BRIEF ANALYSIS ON OPERATION DISTRICT COMMUNICATION
    Journal of Railway Engineering Society   2000 Vol.17 (2): 91-92 [Abstract] (2479) 1 [HTML 1 KB] [PDF 76 KB] (89)
29 XU Wang-peng
  SOME PROPOSALS ON CONSTRUCTION SURVEY OF HIGH-SPEED RAILWAY
    Journal of Railway Engineering Society   1999 Vol.16 (4): 29-32 [Abstract] (2512) 1 [HTML 1 KB] [PDF 231 KB] (164)
21 LU Yongchen
  PLANE SURVEY AND VERTICAL CONTROL OF HIGH-SPEED RAILWAY
    Journal of Railway Engineering Society   1998 Vol.15 (4): 21-28 [Abstract] (2542) 1 [HTML 1 KB] [PDF 212 KB] (123)
67 HU Lianjun, CAI Wenfeng, ZHANG Weifeng
  Research on the Design Parameters and Experiment Methods of Fastening System for Medium and Low Speed Maglev Track
    Journal of Railway Engineering Society   2022 Vol.39 (6): 67-72 [Abstract] (2268) 0 [HTML 0 KB] [PDF 794 KB] (1957)
100 QIN Baolai, SUN Shigang, CHENG Bin
  Experience, Reference and Inspiration of European High-speed Railway Construction Management Mode
    Journal of Railway Engineering Society   2022 Vol.39 (6): 100-103 [Abstract] (2303) 0 [HTML 0 KB] [PDF 468 KB] (1919)
109 DUAN Xiaochen, ZHAO Chenguang, LI Ming, SHI Zhendong
  Research on the Intelligent Control Method of Subway Shield Construction Schedule and Investment
    Journal of Railway Engineering Society   2023 Vol.40 (1): 109-115 [Abstract] (2520) 0 [HTML 0 KB] [PDF 1145 KB] (1142)
First page | Prev page | Next page | Last pagePage 9 of 9, 266 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech