Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "U443":
57 ZHENGHong-ning,JIN De-hui
  OPTIMIZING THE STRUCTURE OF SIDEWALK ON CURVED BRIDGE TO INCREASE AESTHETIC PERCEPTION OF FLOOR SYSTEM ON RAILWAY BRIDGE
    Journal of Railway Engineering Society   2000 Vol.17 (3): 57-61 [Abstract] (2613) 1 [HTML 1 KB] [PDF 164 KB] (124)
42 WANG Zhao-hui
  CONSTRUCTION TECHNIQUE THAT BRING PRESTRESSED EQUIVALENT PRESSURE TO BEAR ON NO. 0 BLOCK CANTILEVER BRACKET OF CONSTRUCTED BRIDGE
    Journal of Railway Engineering Society   1999 Vol.16 (4): 42-46 [Abstract] (2511) 1 [HTML 1 KB] [PDF 249 KB] (133)
58 CUI Hua-lin
  APPLICATION OF SYNTHETIC DE WATERING AND DRAINAGE TECHNIQUE DURING CONSTRUCTION OF TUNNEL WITH PLENTY- WATER EXTREMELY-WEAK SURROUNDING ROCK
    Journal of Railway Engineering Society   1999 Vol.16 (4): 58-61 [Abstract] (2475) 1 [HTML 1 KB] [PDF 212 KB] (98)
66 DONG Xu-fan,WU Ming-hua,CHEN Li-ping,LI Bin,HUANG Jian-zhong
  DEVELOPMEANT ON CAD SYSTEM FOR RAILWAY CULVERT
    Journal of Railway Engineering Society   1999 Vol.16 (4): 66-69 [Abstract] (2594) 1 [HTML 1 KB] [PDF 208 KB] (155)
20 ZHAO YU-Cheng
  PRACTICES ON ELEVATED LONG-SPAN BRIDGE AND JOINTLESS WELDED RAIL FOR URBAN RAIL COMMUNICATON
    Journal of Railway Engineering Society   1999 Vol.16 (3): 20-25 [Abstract] (2490) 1 [HTML 1 KB] [PDF 344 KB] (120)
26 Ll Fang-zhi,JI Wen-yu,XU Ke-bin
  CHOICE OF CALCULATION METHOD OF LIMIT BEARING CAPACITY FOR RAILWAY BRIDGE PIER AND ABUTMENT
    Journal of Railway Engineering Society   1999 Vol.16 (3): 26-29 [Abstract] (2552) 1 [HTML 1 KB] [PDF 196 KB] (95)
30 LUO Qiang, CAI Ying
  STUDY ON TECHNOLOGICAL TREATMENT METHODS OF HIGH SPEED RAILWAY BRIDGE—SUBGRADE TRANSITION
    Journal of Railway Engineering Society   1999 Vol.16 (3): 30-33 [Abstract] (2444) 1 [HTML 1 KB] [PDF 248 KB] (57)
34 HUANG Wu
  CONSTRUCTION TECHNIQUE OF STEEL STRUCTURE FOR LONGSPAN STEEL PIPE CONCRETE ARCH RAILWAY BRIDGE
    Journal of Railway Engineering Society   1999 Vol.16 (3): 34-38 [Abstract] (4773) 1 [HTML 1 KB] [PDF 214 KB] (120)
39 LU Jian-zhong
  CONSTRUCTION OF STIFFENING PRESTRESSED CONCRETE CONTINUOUS BEAM WITH TIE BAR ARCH OF NET WEB MEMBERS
    Journal of Railway Engineering Society   1999 Vol.16 (3): 39-42 [Abstract] (4767) 1 [HTML 1 KB] [PDF 204 KB] (121)
43 GUO Sheng-zhen
  ELEMENTARY TALKING ABOUT JOINTLESS TRACK ON BRIDGE
    Journal of Railway Engineering Society   1999 Vol.16 (3): 43-44 [Abstract] (2511) 1 [HTML 1 KB] [PDF 128 KB] (136)
31 LEI Xiao-yan,LI Ming-hua
  ANALYSES OF CLIP BOLT FRACTURE FOR GUARD RAIL OF RAILWAY BRIDGE
    Journal of Railway Engineering Society   1999 Vol.16 (2): 31-35 [Abstract] (2496) 1 [HTML 1 KB] [PDF 314 KB] (126)
39 WANG Qiang,LENG Wu-ming
  UNCERTAINTY ANALYSIS OF THE DESIGN VARIABLES OF THE RAILWAY BRIDGE’S SHALLOW FOUNDATIONS
    Journal of Railway Engineering Society   1999 Vol.16 (2): 39-42 [Abstract] (2539) 1 [HTML 1 KB] [PDF 278 KB] (96)
21 ZHAO Yucheng
  JOINTLESS RAIL ON BRIDGE IN RALLWAY OF WEST EUROPE
    Journal of Railway Engineering Society   1999 Vol.16 (1): 21-28 [Abstract] (2502) 1 [HTML 1 KB] [PDF 392 KB] (205)
34 LU Wenliang, PENG Wenqiang, CHEN Liangjiang, GAO Ce, ZHOU Yongzheng
  Research on the Maximum Temperature Difference between Core and Surface of Concrete Hollow Column during Service Period
    Journal of Railway Engineering Society   2023 Vol.40 (1): 34-41 [Abstract] (2546) 0 [HTML 0 KB] [PDF 1718 KB] (1128)
First page | Prev page | Next page | Last pagePage 3 of 3, 74 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech