Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
Other articles related with "U455":
82
ZHAI Xu—dong,PENG Li—min
Research on the Accumulated Deformation of Foundation Base of Multiarch Tunnel in Karst Region under Effect of Train—induced Load
Journal of Railway Engineering Society 2010 Vol.27 (10): 82-87 [
Abstract
] (
2527
) 1 [
HTML
1 KB] [
PDF
607 KB] (
99
)
46
GUO Rui,FANG Yong,HE Chuan
Study on the Correlation between Stress Release and Displacement Release DuringTunnel Excavation
Journal of Railway Engineering Society 2010 Vol.27 (9): 46-50 [
Abstract
] (
3059
) 1 [
HTML
1 KB] [
PDF
416 KB] (
205
)
74
DING Lie—yun,LI Wei—ming,WU Xian—guo,ZHOU Cheng,LUO Han—bin
Analysis of Monitoring Deep Foundation Pit for Xunlimen Station of Wuhan Metro
Journal of Railway Engineering Society 2010 Vol.27 (9): 74-77 [
Abstract
] (
3042
) 1 [
HTML
1 KB] [
PDF
472 KB] (
292
)
82
WANG Hui, ZHU Wei-bin, LI Da-yong
Construction Method and Control Measure for Connecting Passage inWater-enriched Sand Bed
Journal of Railway Engineering Society 2010 Vol.27 (9): 82-87 [
Abstract
] (
2578
) 1 [
HTML
1 KB] [
PDF
447 KB] (
416
)
55
PENG Feng,LIU Guang—jun
Research on Sleeve—valve—pipe Grouting Technology for Reinforcing the Pearl River Dam Underpassed by Shiziyang Tunnel
Journal of Railway Engineering Society 2010 Vol.27 (7): 55-59 [
Abstract
] (
2592
) 1 [
HTML
1 KB] [
PDF
362 KB] (
174
)
60
CHEN Zhl.YU Hua—wei
Prevention of Through Crack in Secondary Lining of Railway Mountain Tunnel
Journal of Railway Engineering Society 2010 Vol.27 (7): 60-63 [
Abstract
] (
2579
) 1 [
HTML
1 KB] [
PDF
118 KB] (
258
)
70
ZHANG Ying-cai
Technology for Construction of Hanguguan Tunnel Under-passing New Loess Gulch
Journal of Railway Engineering Society 2010 Vol.27 (6): 70-73 [
Abstract
] (
2572
) 1 [
HTML
1 KB] [
PDF
339 KB] (
110
)
43
YANG Hui-jun
Analysis of Impact of Construction of Shallow Large-span Tunnels on Environment with Surface Excavation method
Journal of Railway Engineering Society 2010 Vol.27 (5): 43-47 [
Abstract
] (
2723
) 1 [
HTML
1 KB] [
PDF
645 KB] (
206
)
48
ZHANG Ping-liang, FANG Xin-xian, ZHANG Yun-liang, AN Yong-lin
Safety Assessment of Tunneling Based on Surface Settlement Standard
Journal of Railway Engineering Society 2010 Vol.27 (5): 48-53 [
Abstract
] (
2550
) 1 [
HTML
1 KB] [
PDF
280 KB] (
198
)
54
SHAO Shuang-xiu
Technique for Construction of Heluoshan Tunnel in Water-rich Stratum
Journal of Railway Engineering Society 2010 Vol.27 (5): 54-57 [
Abstract
] (
2579
) 1 [
HTML
1 KB] [
PDF
327 KB] (
153
)
58
ZHANG Jian-ru
Grouting Technology for Construction of Mountain Tunnel in High-pressure Water-rich Fault Fracture Zone
Journal of Railway Engineering Society 2010 Vol.27 (5): 58-62 [
Abstract
] (
2571
) 1 [
HTML
1 KB] [
PDF
556 KB] (
216
)
29
XU Hongxing, DENG Yiming
Analysis of Hydrogeology Problems Related to Water Bursting in Area of DK124+602 at Yesanguan Tunnel of Yichang-Wanzhou Railway
Journal of Railway Engineering Society 2010 Vol.27 (4): 29-34 [
Abstract
] (
2513
) 1 [
HTML
1 KB] [
PDF
480 KB] (
209
)
87
ZHANG Ying-cai, HU Guo-wei, XIN Zhen-xing
Comparative Analysis and Selection of Construction Methods for Large Section Loess Tunnel
Journal of Railway Engineering Society 2010 Vol.27 (3): 87-92 [
Abstract
] (
2596
) 1 [
HTML
1 KB] [
PDF
622 KB] (
719
)
118
BAO Yong-liang, ZHENG Qi-zhen, TANG Jian-zhong
Technology for Originating Construction of Shield Tunnel in Soft Soil Stratum in Shanghai
Journal of Railway Engineering Society 2010 Vol.27 (3): 118-122 [
Abstract
] (
2623
) 1 [
HTML
1 KB] [
PDF
289 KB] (
121
)
56
FANG Yong, HE Chuan
Numerical Analysis of Earth-pressure-balance Shield Driving Considering Based on Construction Course
Journal of Railway Engineering Society 2009 Vol.26 (11): 56-60 [
Abstract
] (
2529
) 1 [
HTML
1 KB] [
PDF
555 KB] (
118
)
61
ZHANG Y ing-m ing, DING Li-jin
Discussion on the Construction Scheme of Tunnel Entrance in Crowded Population Area
Journal of Railway Engineering Society 2009 Vol.26 (11): 61-63 [
Abstract
] (
2614
) 1 [
HTML
1 KB] [
PDF
471 KB] (
196
)
106
CAO Hong-ling
The Design and Construction of the Entrance to SubwayM ined Tunnel from Deep Foundation Pit
Journal of Railway Engineering Society 2009 Vol.26 (10): 106-110 [
Abstract
] (
2529
) 1 [
HTML
1 KB] [
PDF
951 KB] (
135
)
48
WANG Shen—ping
Railway Route Selection Principles Based on the Classification of Engineering Geological Condition in Permafrost Regions
Journal of Railway Engineering Society 2009 Vol.26 (8): 48-52 [
Abstract
] (
2604
) 1 [
HTML
1 KB] [
PDF
368 KB] (
106
)
77
LIN Gang,LUO Shi—pei
Application of Fiberglass Reinforcement in Exterior-protected Structure of Shield End Shaft
Journal of Railway Engineering Society 2009 Vol.26 (8): 77-81 [
Abstract
] (
3053
) 1 [
HTML
1 KB] [
PDF
475 KB] (
290
)
80
LI Shu-jing
Construction Technologies for Secondary Lining of the Low Wall and Primary Filling of the Side Arch of Tunnel
Journal of Railway Engineering Society 2009 Vol.26 (5): 80-83 [
Abstract
] (
2537
) 1 [
HTML
1 KB] [
PDF
250 KB] (
252
)
62
LIU Jian-guang
Analysis of the Parameters Related to Determining the Midway between Tracks in High-speed Railway Passenger Station
Journal of Railway Engineering Society 2009 Vol.26 (4): 62-66 [
Abstract
] (
2589
) 1 [
HTML
1 KB] [
PDF
710 KB] (
133
)
64
TU Yang-zhi
Analysis of the Local Stress in Cable-beam and Cable-tower Anchorage Zone ofCable-stayed Arch Combined Bridge
Journal of Railway Engineering Society 2009 Vol.26 (2): 64-68 [
Abstract
] (
2487
) 1 [
HTML
1 KB] [
PDF
866 KB] (
122
)
79
ZHAO Qiang
Research on the Scheme for Construction of Transriver Tunnel of Line 4 of Wuhan Urban Mass Transit
Journal of Railway Engineering Society 2008 Vol.25 (12): 79-82 [
Abstract
] (
3059
) 1 [
HTML
1 KB] [
PDF
458 KB] (
108
)
91
GONG Xu-dong
TBM Type Selection for Experimental Section of Line 2 of Xifan Metro and Construction Experience
Journal of Railway Engineering Society 2008 Vol.25 (12): 91-94 [
Abstract
] (
3074
) 1 [
HTML
1 KB] [
PDF
440 KB] (
155
)
45
WANG Yu-hua,LI Hai - min,WANG Li-jun
Analyses of the Displacement Caused by Shield Construction
Journal of Railway Engineering Society 2008 Vol.25 (11): 45-48 [
Abstract
] (
3024
) 1 [
HTML
1 KB] [
PDF
351 KB] (
128
)
57
WU Rong-feng
Construction Technology of Tunnel Entrance
Journal of Railway Engineering Society 2008 Vol.25 (11): 57-61 [
Abstract
] (
2511
) 1 [
HTML
1 KB] [
PDF
463 KB] (
343
)
62
FANG Hua,LI Guo-cheng, DING Lie-yun,LI Xiao-qing, WU Xian-guo,LUO Han-bin
Numerical Simulation for the Effect of Tunnel Shaft Construction on Buried Pipelines
Journal of Railway Engineering Society 2008 Vol.25 (11): 62-65 [
Abstract
] (
2551
) 1 [
HTML
1 KB] [
PDF
377 KB] (
155
)
24
LI Ze-rong
Design of Horizontal Rotary Erection Construction Technique for Da yan dong Major Bridge
Journal of Railway Engineering Society 2008 Vol.25 (10): 24-27 [
Abstract
] (
2534
) 1 [
HTML
1 KB] [
PDF
177 KB] (
123
)
28
WANG Tian-ming
China Railway First survey and Design Institute Group ,Ltd,Xi'an Shanxi710043,China
Journal of Railway Engineering Society 2008 Vol.25 (10): 28-31 [
Abstract
] (
2557
) 1 [
HTML
1 KB] [
PDF
545 KB] (
124
)
36
XU Xiang-dong
Preliminarily Exploration on the Function Mechanism of Prevention and Treatment of Rockbrust for Tunnel
Journal of Railway Engineering Society 2008 Vol.25 (10): 36-39 [
Abstract
] (
2582
) 1 [
HTML
1 KB] [
PDF
468 KB] (
162
)
First page
|
Prev page
|
Next page
|
Last page
Page 3 of 6, 177 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech