1
Present Situation of Railway's Energy-saving and Its Improving Technological Path
ZHOU Xin-jun
Research purposes : Through analyzing the situation of the railway's energy-saving, it reveals the importance of railway to save energy and lower energy consumption and it also reveals the strategic sense of improving the integration transportation structure. Based on present energy-saving technology , the railways development tendency and characteristics of China's energy,the future improving technological path for the railway's energy-saving is predicated.
Research Conclusions:With a series of institution arrangement and realistic technological methods, the railway has make great progress in optimizing the energy consumption structure and further lowering the unit energy consumption. Railway has huge latent to save energy. The improving technological path concentrates on the two sectors. One is to further implement the project of substituting the electricity for oil and the other is to change the production increasing way and energy consuming way with the technical methods of the transportation institutional adjustment, etc.
2008 Vol. 25 (11): 1-5 [
Abstract
] (
2517
)
HTML
(1 KB)
PDF
(459 KB) (
146
)
6
Influence of Subterranean Construction on the Groundwater Environment
YANG Xiao-ting, ZHANG Hui, WANG Wen-ke, WANG Zhao
Research purposes: The studies are done on the Influence of subterranean construction on groundwater environment in the processes of construction and operation for the purposes of providing the scientific basis for underground construction project planning and environmental protection of underground water.
Research results: Based on the summary on influence of understructure work construction on ground water environmental and taking the Line 2 of Xi ˊan City Rail Communication as an example , the influence of foundation pit precipitation in construction period on the groundwater environment is calculated with empirical formula and the influence on the flow field of groundwater after metro operation is predicated with the numerical simulation the method. However, the foundation pit precipitation only occurred in the Zhang Village station with the central water level dropping 6. 3 m, the precipitation of 10 454. 15 m3/d and influencing radius of 441 m. This will have certain influence on the ground-water flow because the underwater flow mute will be dammed by the metro track, resulting in head water raising and rear water lowering with simulation change amplitude of underground water level between 0~1.7 m.
2008 Vol. 25 (11): 6-10 [
Abstract
] (
2570
)
HTML
(1 KB)
PDF
(400 KB) (
409
)
11
Quantitative Analysis of Coordination between Rail Transit Network Configuration and Urban Form
WANG Yu-ping,CHEN Kuan - min,MA Chao-qun
Research purposes: At present, the coordination analysis between rail transit network configuration and urban form was restricted to qualitative method during urban rail transit network planning in China. A means of quantitative analysis will contribute to building a reasonable rail transit network.
Research results: Three quantitative indexes were put forth such as the fitness between urban rail transit network middle and city gravity centre, the fractal dimension identity between urban rail transit network and urban form, and the direction coordination between urban rail transit and city developing. Based on these quantitative indexes, a compositive coordination index was built to quantitatively analyze the coordination between rail transit network configuration and urban form. Take Xi an urban rail transit network planning for instance , the coordination between it is four pre-selection networks and urban form was analyzed. These compositive coordination indexes of four pre-selection network were 0. 7829,0. 7778 , 0. 6908 , 0. 7849 , the computing results showed that the forth network is the best one.
2008 Vol. 25 (11): 11-15 [
Abstract
] (
2539
)
HTML
(1 KB)
PDF
(469 KB) (
190
)
16
The Building of Railway Construction Control Network in the High Altitude Area
NING Li-Ping
Research purposes: In the railway control surveying of the high-altitude areas, the side of control network will have a greater length of the projection length distortion. If the control network is established over the national coordinates in the region, the deformation of the length of the railway construction can not meet the requirements of precision control network, which will have a great effect on the coordinates stakeout of line construction survey and breakthrough measurement. Therefore, a reasonable length of the evaluation and treatment of deformed projection of the results of coordinates, and the establishment of high-altitude areas to control the construction of the railway network has become an important part of engineering control surveying in the area.
Research conclusions: In the high altitude control surveying of the railway construction , distortion of reductions of elevation is mainly in the length deformation. So , it is the best choice to select the level surface with compensation used as plane of projection,and build an independent coordinates system based on the orthomorphic projection 3°bands. The method is simple conversion, furthermore, the result of calculated coordinates is very close to the coordinates in the original coordinate system of national unity. It is helpful for the link between inside and outside of the surveying area. If the line length has a wide span from east to west, and when the center of the surveying area is far from the central meridian, we should consider selecting” any local projective stripes" or other methods.
2008 Vol. 25 (11): 16-19 [
Abstract
] (
2603
)
HTML
(1 KB)
PDF
(384 KB) (
194
)
20
Methods and Technology for Active and Passive Temperature Control of Frozen Soils
WEI Zhi,JIN Hui-jun,ZHANG Jian-ming,WU Jin-kui,YANGSi-zhong,JI Yan-jun
Research purposes: Frozen ground temperature changes will cause complex changes in seepage,temperature and stress fields. Active and passive temperature controls are the basic methods for frozen soils temperature control. But it is difficult to distinguish the active and passive concepts, so it is important to clarify the essential difference between active technology and passive technology for temperature control of frozen soil.
Research conclusions: From the viewpoint of energy, the passive temperature requires no power and no moving mechanical parts during operation, which is the most commonly used technology for frozen soils temperature control. On the contrary, the active temperature control requires power to operate or has moving parts in temperature control system. The most distinct features of the two methods are that whether the freezing process can be controlled and whether need any support to energy consumption. For some calculation of frozen soils temperature control, there are a lot of formulas and charts obtained in long time, which can be used, but if it wants a more precise calculation, it needs simulation with some mature models.
2008 Vol. 25 (11): 20-26 [
Abstract
] (
2533
)
HTML
(1 KB)
PDF
(649 KB) (
301
)
27
Research on the Heat Transfer Law of Ventilation Pipeline Embankment in Permafrost Regions of Qinghai-Tibet Plateau
JIANG Fu-Qiang,YANG Yong-pang
Research purposes: The ventilation pipeline embankment engineering is a new type embankment structure, it posses the characteristic of reduce temperature and raise artificial permafrost table, ensure the railway embankment safely during the construction of the railway and normal working. Based on the special climatic conditions and characteristics of air circulation of Qinghai-Tibet plateau, this paper analyzes of the way of sir convection in ventilation pipe and applies the basic theory of heat transfer to research on heat transfer law of ventilation pipeline embankment in permafrost regions of Qinghai-Tibet plateau.
Research results: The paper, basil on the systematic analysis and research, advances heat transfer theory of ventilation pipeline embankment in permafrost regions of Qinghai-Tibet plateau. The author thought the ventilation pipeline embankment has three heat transfer mode, namely, forced convection air, natural convection heat transfer and heart exchange. And the maximum effectiveness of a reasonable length and pathway was gained through theoretical calculations and test results in permafrost regions of Qinghai-Tibet plateau.
2008 Vol. 25 (11): 27-30 [
Abstract
] (
2523
)
HTML
(1 KB)
PDF
(408 KB) (
111
)
31
Influence Analysis of the Stability by the Collar Beam of Double-shaft and Thin-wall High-rise Pier Rigid Frame Bride
LI Jian-gang,Du Yu-dong, Wei Yan-ling, ZHANG Jun-bo
Research purposes: The stability of the high-rise pier is always a critical factor for the safe of bridge. How to increase the stability of the high-rise pier, and at the same time make the appearance aesthetic and the force reasonable,is always a question for the engineers explored. The paper analyses the spacial stability for the double-shaft and thin-wall high-rise pier bridge of the Jing-Cheng-San-Qi Qingshuihe 2#, with the three-dimensional finite element analysis software SAP2000,comparisons for the stability of the non-collar beam between the double-shaft of the high-rise pier and the added-collar beams for the longest cantilever construction and the final completion are analyzed.
Research conclusions: The influence of the stability by the collar beam for the double-shaft and thin-wall high-rise pier is preliminarily given; the collar-beam is making a larger contribution to the straight forward stability for the bridge, and has little effect for the lateral stability; increasing the collar-beam between the thin-wall piers , the contribution for the stability comes to the stabilization. The collar-beam between the thin-wall piers is effectively increasing the stability for the double-shaft and thin-wall high-rise pier bridge, but after a certain extent, increasing the numbers of the collar-beam is not apparent.
2008 Vol. 25 (11): 31-34 [
Abstract
] (
2533
)
HTML
(1 KB)
PDF
(363 KB) (
239
)
35
Simulation Analyses of Reinforcement Concrete Box Cofferdam and Its Establishing Model Method
LIU Shu-ai
Research purposes: Based on the construction of the high pile cap of the Qingdao Bay Big Bridge, the analyses of the load on the reinforcement concrete box cofferdam are made with general finite element analysis software. With the finite element simulation analysis of the actual working state of the R. C. box cofferdam, the data are obtained for the purpose of optimizing the construction technology场decreasing the structure dimension and hoisting weight as much as possible.
Research conclusions: The simulation load analysis to the box cofferdam with solid65 element can solve the unit freedom coupling of the reinforcement concrete mixed materials effectively and perfectly simulate the dimension, space location, connecting conditions, edge conditions and space carrying state to provide high exact value model for the structural optimum and high exact value for the construction.
2008 Vol. 25 (11): 35-38 [
Abstract
] (
2505
)
HTML
(1 KB)
PDF
(403 KB) (
103
)
39
Traveling Wave Effect Analysis of Cable-stayed Bridge with Support System Based on More Incentives Dynamic Model
YU Ming-qiu, ZHU Bing
Research purposes: Importation of the earthquake incentives is the weakest link for seismic design of large- span bridge structure. As the greater distance between basis of the large-span bridge structure, traveling wave effect should be considered in the progress of earthquake response analysis. At present, the law of the research on traveling wave effect for cable - stayed bridge with support system is rare in domestic. Based on the large-scale finite element analysis software MIDAS/CIVIL computing platforms, a more accurate simulation for the seismic waves on the basis of the cable-stayed bridge spanning railway in center of Zhengzhou differences under the different locations incentive has been performed in this paper, as well as analysis and comparison of the wave traveling wave effect when the bridge be at different velocity of the seismic, a general discussion on traveling wave effect of this bridge-type has been achieved.
Research conclusions: ln a certain phase difference, when considering the one-way trip to the wave effect and three orthogonal traveling wave effect, internal forces and displacement of the structure both change cyclically, with natural cycle the same basically. At the same time, traveling wave effect results a significant impact on the response peak to the earthquake for the cable-stayed bridge with support system.
2008 Vol. 25 (11): 39-44 [
Abstract
] (
2713
)
HTML
(1 KB)
PDF
(493 KB) (
128
)
45
Analyses of the Displacement Caused by Shield Construction
WANG Yu-hua,LI Hai - min,WANG Li-jun
Research purposes : The scale of the displacement is essential to the successful construction of tunnel in city. The boring parameters should be decided rationally through making analyses of the stratum stress change, soil loss and deformation of pipe lining caused by shield construction for the purposes of establishing effective soil pressure balance, reducing the disturbance,stratum and stratum loss, and guaranteeing construction safety.
Research Conclusions:Taking the shield construction of bidding 19 of Line 4 of Beijing metro as an example, this paper analyzes the stratum stress change caused by the excavation and the displacement caused by stratum loss with the monitoring and measurement on the site. The results of analysis and measurement show the deformations can be controlled in the prescribed limit if the parameters of soil pressure, synchronic grouting and boring speed are decided rationally and an effective soil pressure balance is established.
2008 Vol. 25 (11): 45-48 [
Abstract
] (
3024
)
HTML
(1 KB)
PDF
(351 KB) (
128
)
49
Treatment Technology for Water and Mud Bursting on 1·21 in Maluqing Tunnel of Yichang-Wanzhou Rail
ZHANG Min-qing,HUANG Hong-jian,ZHANG Sheng-xue,WU Jun,LI Xie-huai
Research purposes:Based on the introduction to the water and mud bursting process in the Maluqing Tunnel, pumping and draining water test and constructing water stopping plug in the earth's surface deep hole, and observation of water stopping plug circa opened out by excavation in the course of tunnel construction, this paper analyzes the reason for the failure of stop water plug, discusses the water stopping plug mechanism, and presents the measure for improving the technology for construction of water stopping plug for the purpose of accumulating experience for the similar engineering in future.
Research conclusions: If the most substances in water and mud bursting are mud and sand, it is difficult for pumping water to treat water and mud bursting. In this case, the water stopping plug should be adopted to treat water and mud bursting. Based on the verification of the shearing force, the plug length should be designed according to the characters of water and mud bursting and grouting mechanism. The medium of the water and mud bursting in the Maluqing Tunnel is the cohesive soil and water, so the grouting mechanism should has the hustle-sediment action, the hydrate- concretion action and the float - sediment action in the cement concretion by the effect of the rainfall and the disconnected grouting. Therefore,the length of the water stopping plug must be of 10-20 times of the hole diameter.
2008 Vol. 25 (11): 49-56 [
Abstract
] (
2587
)
HTML
(1 KB)
PDF
(727 KB) (
305
)
57
Construction Technology of Tunnel Entrance
WU Rong-feng
Research proposes:The construction of tunnel entrance is the key part of the whole engineering. According to the characteristics of the tunnel entrance, how to think in advance to design feasible scheme for the construction of entering the tunnel is the most important step. This scheme should not only decrease the engineering quantity of the tunnel entrance slope excavation and the support, but also protect the protophyte around the entrance. It can simultaneously accelerate the project progress and ensure the construction safety.
Research results:The tunnel entrance construction should be based on site topography,geology, hydrology, from the environmental point of view, to develop a scientific and rational program hole, using a reasonable construction technology, methods and steps to carry out the construction. The paper explains that the long-span tunnel construction method should be changed into the small-span method(such as CD method, CRD method, etc.)and auxiliary construction methods(such as ring type excavation with conservation of core soil, advanced entrance construction method, etc.),so as to effectively solve the potential safety problems and environmental problems.
2008 Vol. 25 (11): 57-61 [
Abstract
] (
2511
)
HTML
(1 KB)
PDF
(463 KB) (
343
)
62
Numerical Simulation for the Effect of Tunnel Shaft Construction on Buried Pipelines
FANG Hua,LI Guo-cheng, DING Lie-yun,LI Xiao-qing, WU Xian-guo,LUO Han-bin
Research purposes: Investigating the effect of Wuhan Yangzte River tunnel construction on buried pipelines is very important to ensure the construction safety. 3-D FEM is applied to model the deformational coupling effect for the north side shaft diaphragm, surrounding soil and buried pipelines. Construction effect on pipe deformation is analyzed in terms of excavation steps, pipe material, buried depth, distance to pit, pipe diameter and wall thickness of pipe.
Research conclusions: Take the north side shaft construction of Wuhan Yangzte River tunnel for example, this paper analyzes the construction effect in terms of excavation steps, pipe material, buried depth, distance to pit, pipe diameter and wall thickness of pipe. The result indicates that the pipeline displacement increases as excavation depth. The magnitude of the displacement is mainly determined by the first two excavation stages. The first two excavation stages should be strictly monitored; for the sake of diaphragm wall, end-effect exists on the pipeline. End-effect becomes distinct as close to the pit. And the displacement mode is changed for the sake of end-effect; outer diameter and thickness of pipeline has no distinct effect on pipeline displacement; multiple types of pipelines have no distinct effect on each other when they exist together.
2008 Vol. 25 (11): 62-65 [
Abstract
] (
2551
)
HTML
(1 KB)
PDF
(377 KB) (
155
)
66
Application of Multiple-goal Planning Theory in Tunnel Excavation Subsequence
CONG En-wei
Research purposes: To the excavation of sectional tunnel with multiple canes, the different excavation subsequences have the different poured stresses and folded routs, resulting in different results. Especially when conducting construction very soon, the stratum change caused by the excavation directly influences the displacement and deformation of existing structure, so it is very important to do research on the excavation subsequence of sectional tunnel with multiple zones. Taking subsurface excavation of Guoshuang Section of Line 10 of Beijing metro underpass the existing Line 1 as an example, this paper introduces the application of multiple-goal planning theory in optimizing the excavation subsequence of tunnel.
Research results:Through calculating and optimizing the excavation subsequence with multiple-goal planning theory, and taking many rational technical measures , the subsidence of the existing Line 1 under-passed by Line 10 in Guoshuang Section is effectively controlled and the max. subsidence value is 4. 83 mm, which is less than the limitation value of 5 mm and guarantees the construction safety and normal operation of existing Line 1.
2008 Vol. 25 (11): 66-72 [
Abstract
] (
2546
)
HTML
(1 KB)
PDF
(558 KB) (
157
)
73
The Application of Nondestructive Testing Using Radar in Tunnel Lining
WANG Hong-liang,ZHANG Yun-liang,AN Yong-lin, PENG Li-min
Research purposes: It is of significance to detect secondary lining's defect of tunnels as well as to repair and strengthen the secondary lining. Radar was applied to detect lining's defect in Jiaoxiling tunnels. Direct stiffness method was used to study the influence of holes on the lining mechanics.
Research conclusions:Main defects of the secondary,holes lying behind the crown, and the next is seepage. The secondary lining mechanic is showed to be very complex and unfavorable due to holes. The weak parts locate the crown and middle of the arch. The first reason of lining defect is that construction had not adopted IVATM and had not caught the key design meaning. The next reason is that it is hard to fill the crown fully and densely. Some treatments are presented if the hole size lying behind the crown is very large to ensure the operation in safety.
2008 Vol. 25 (11): 73-76 [
Abstract
] (
2729
)
HTML
(1 KB)
PDF
(395 KB) (
195
)
77
Design Innovation and Application of Linear Motor Vehicles Depot in Airport Express Line of Beijing
LU Gui-ying, XUE Bo, NIU Shu-xia
Research purposes: The Airport Express Line is the first to adopt linear motor vehicles operated in Beijing railway. This project needs to establish the automatic LIM Depots. ON condition of no practice and reference, we research on the vehicles characteristics to carry on the design fully.
Research results: Through analysis of the characteristics of linear motor vehicles and the line , we integrate the single construction that displaying the characteristics of LIM fully. With proved, compared to choose, learned from the advanced maintenance concept design in foreign, we put forward a reasonable overall layout and save the land. By use of the new technology and the new idea boldly, we develop the practical and feasible maintenance pattern which laid the foundation for widespread using the automatic LIM vehicles in Beijing, to gain the experience and to save the project investment.
2008 Vol. 25 (11): 77-81 [
Abstract
] (
2609
)
HTML
(1 KB)
PDF
(479 KB) (
250
)
82
The Comparison of Evacuation Methods in City Underwater Tunnel
FANG Zheng,HUANG Song-tao,YUAN Jian-ping,YIN Zuo-cheng
Research purposes: As there are more and more urban underwater tunnel being constructed, fire safety in these tunnels becomes a big issue during the design and management, and it is very important to explore how to deal with the tunnel fire. In the urban underwater tunnel,the vehicle and people flow is huge and the tunnel is U-type,so it is difficult for people to egress when a fire breaks out.
Research conclusions:Generally, there are three types of evacuation in the tunnel, which are the corridor neighbour tunnel evacuation, the special horizontally tunnel evacuation and the inner vertically evacuation. Through the comparison among these evacuation methods, it is concluded that the evacuation type and the distance between two transverse tunnels should be determined by the geological and constructional condition.
2008 Vol. 25 (11): 82-86 [
Abstract
] (
2538
)
HTML
(1 KB)
PDF
(477 KB) (
163
)
87
Research on the High Performance Concrete Construction Technology for Large Sectional Loess Tunnel
LIU Xu –quan
Research purposes: The researches are done on the high performance concrete construction technology for large sectional loess tunnel, including option of raw materials for concrete,design of matching ratio, matching the concrete construction machines, concrete construction techniques and inspection of concrete construction quality, for the purposes of overcoming the problems in construction of large sectional loess tunnel on Zhengzhou-Xi an Passenger Dedicated Line and seeking the suitable construction technology for loess tunnel.
Research results: Through doing researches, the design scheme of matching ratio of high performance concrete is selected to meet the durable requirement, the matching technology of concrete construction machinery and construction procedure,mastered, and the summary is made on high performance concrete construction technology for large sectional loess tunnel on passenger dedicated line to achieve the rapid, high quality and high efficient construction.
2008 Vol. 25 (11): 87-91 [
Abstract
] (
4795
)
HTML
(1 KB)
PDF
(541 KB) (
98
)
92
Research on the Effect of Silica Fume on the Performance of the Concrete with Higher Bending Strength
LIU Wen-yong
Research purposes :To increase the span and improve the durability of the concrete railway bridge is the main direction of the research in the high performance concrete , while the pre-stressed concrete is the mainly used one. In the mix bathing of the high-pre-stressed concrete, used in the construction of large-span pre-stressed concrete railway bridge, silica fume and super slag fines is the best active pozzolana. The purpose of this experiment is to improve the bending strength and durability of the concrete, and the approach is to replace the slag cement with the same amount of silica fume.
Research conclusions:The results of the experiment are as follows; the bending strength of the concrete with 8% of the slag cement substituted by silica fume is 8. 8 MPa at the three-day age, increased by 44.3 %,while it is 11. 4 MPa at the twenty eight-day age, increased by 50.0%;some properties of the sample ZR-2,adulterated with silica fume , ,dramatically prior to the sample ZR-1,such as the corrosion-resistant properties of brine salt solution , anti- freeze-thaw performance and anti-permeability performance. According to the data of this experiment, we could assert that with 8% of slag cement substituted by isometric silica fume, the high-bending concrete with good durability could be achived.
2008 Vol. 25 (11): 92-95 [
Abstract
] (
2607
)
HTML
(1 KB)
PDF
(383 KB) (
133
)
96
Research on the Vertical Integration of General Construction Contractor
WEI Zhong-Win,GUAM Bai-hai,MA Lan
Research purposes: Contractor construction business System is more and more adopted at home and abroad and the construction enterprises take construction contractor project as their important direction of business development in the future. However, the Chinese construction enterprises usually have single ability of design or construction due to some reasons, so in this case, if the construction enterprise wants to undertake the general construction contractor project, he has to make decision whether he subcontracts those works he has not ability to do or he does all works through improving his ability.
Research results:Through summary on the theoretical base of vertical integration, the analyses of five characteristics of general construction contractor project are made, the discussions are made on the factors influencing the vertical integration of general contractor from six aspects of business cost, production efficiency and management cost, optimum design, investment amount, assets specialization and market competition, and the conclusion is made that the construction enterprise with single ability can carry out the vertical integration toward general construction contractor.
2008 Vol. 25 (11): 96-98 [
Abstract
] (
2535
)
HTML
(1 KB)
PDF
(404 KB) (
182
)
99
Research on the Analysis Method for Economic Benefit of Protection Engineering for Geological Disasters along Railway
HUANG Jian-ling,YANG Ding-Ying
Research purposes :A rational and effective tool is to be found to adapt to the needs of protection and reduce of geological disasters along railway,and to provide some basis for the determination of the actual standard of geological disaster management measures,and even for the decision-making of protection and reduce of geological disasters along railway. Same valuable suggestions。also offered for the settlement of similar engineering problems in the paper.
Research conclusions:The economic benefit of protection engineering for geological disasters along railway is made up of loss-reduced benefit and value-added benefit,which has its own characteristics by compared to general engineering. The loss-reduced benefit is the focus of analysis. By establishing loss accounting model, cost accounting model and economic benefit accounting model, and by the step-by-step analysis of the accounting, the standard of geological disaster management measures and investment programme can be determined.
2008 Vol. 25 (11): 99-103 [
Abstract
] (
2575
)
HTML
(1 KB)
PDF
(451 KB) (
127
)
104
Researches on the Operation and Business Tactics of BT Project
WANG Li-ping
Research purposes: Based on the characteristics of BT project, the analysis of the advantages and disadvantage of the BT project are made for the purpose of providing the theory and technical support to the operation mode and business tactics of BT project.
Research Conclusions: BT project mode is suitable for the developed area with large amount controlled financial revenue. The successful BT project requires a credible and high-efficient government. BT project is action between government and enterprise with signing contract by the authority of government and enterprise rather than company and the enterprise. A perfect BT protect should have good social benefits and evaluation of the government, which can influence the thoughts on the reform of construction management mode in the area, so the more attention should be paid to the BT project mode so as to enlarge the business scope and market portion and realize the scale benefits of the contractor.
2008 Vol. 25 (11): 104-108 [
Abstract
] (
2500
)
HTML
(1 KB)
PDF
(485 KB) (
100
)
109
Research on the EU Policy on Supporting Railways
HOU Jing
Research purposes: Through doing the study on EU's policies on economy, common transportation and railway supporting, this paper analyzes the key effects made by the EU 's policy on transport , especially on railway transport, on the sustainable development strategy and the coordinating development of various transport modes from viewpoint of merging the EU's integration process into the economy, politics and society. The study shows that with the continuous progress of EU's economic policies, EU's integration process is being accelerated, especially when EU's regional policies have promoted the adjustment of economic structures among its member states by financial aids and arrangement of construction projects.
Research conclusions: EU's common transport policy is intended to get rid of various restrictions and coordinate the transports among the member states. To invigorate railway transport is an essential step for realizing a balanced development of different transport modes. EU's policy on railway transport has been laid down in laws, and all the member states,requested to change their policies into laws. For years, EU has made efforts on establishing a unified European railway system for the purpose of establishing a unified European railway market, thus enhancing the unified use of its railways and further opening the railway transport market. EU's railways are financed mainly by public budget , private investment, highway toll income and turning the external costs into internal expenses, so as to maximize the benefits of transport.