A NEW METHOD TO DETERMINE THE LENGTH OF TRACK TRANSI?TION SECTION
WANG Yu1,,ZHAI Wan-ming2, WANG Qi-chang2,LIN Liang-ming1
1.Institute of Precision Engineering and Intelligent Microsystem, Shanghai Jiaotong University; 2. Train ﹠ Track Research Institute,Southwest Jiaotong University
Abstract:After a concise introduction to the track transitions and the theory of vehicle-track cou?pling dynamics,the vehicle/track interactions on the ballast track and ballastless track transition section are systematically analyzed in this paper. The evaluation, indexes are chosen,and a new method, called critical transition scot ion length,is put forward in determine track transition section length.
王于,翟婉明,王其昌,林良明. 一种确定轨道过渡段长度的新方法[J]. 铁道工程学报, 1999, 16(4): 25-28.
WANG Yu,,ZHAI Wan-ming, WANG Qi-chang,LIN Liang-ming. A NEW METHOD TO DETERMINE THE LENGTH OF TRACK TRANSI?TION SECTION. Journal of Railway Engineering Society, 1999, 16(4): 25-28.
[4]HAI Wan-ming. Two simple fast integration methods for large-scale dynamic problems in engineering[J]. International Journal for Numerical Methods in Engineering; 1996,39(24).