Abstract:The paper introduces the model of a complete set of machinery adopted during rapid construction of parallel guiding adit at Fast Qinling Tunnel, as well as the good effects obtained by using this machinery. Explorations arc put forward concerned with the model of a complete set of machinery for construction of major long tunnels. It provides experience and reference for the similar engineering projects.
刘金良,晁庚奇,王敏. 东秦岭隧道平导快速施工机械设备配套模式[J]. 铁道工程学报, 2003, 20(1): 90-93.
LIU Jin-liang, ZHAO Geng-qi, WANG Min. MODEL OF A CONSTRUCTION SET OF MACHINERY DURING RAPID CONSTRUCTION OF PARALLEL GUIDING ADIT AT EAST QINLING TUNNEL. 铁道工程学报, 2003, 20(1): 90-93.