Abstract:In this article, authors are based on the engineering structure, Treated the deviation of the shear wall axial line and sectional dimension in the reinforced concrete high rise walled frame structure,and these deviations are appeared many place in the shear wall from 5th floor to 9th floor,The strengthening treatment method with adopt drilling & bond re?inforcement bar and sprayed concrete has a lot of evident goodness in the shear wall rectify a deviation and strenthening. After analyze these goodness, Search sprayed concrete construction technique and give some advises on sprayed concrete construction execution of work.
张仲先,张杰,陈义平,李绍进. 喷射混凝土在高层建筑剪力墙纠偏加固中的应用[J]. 铁道工程学报, 2004, 21(4): 136-139.
ZHANG Zhong-xian, ZHANG Jie,CHEN Yi-pin, LI Shao-jin. APPLICATION RESEARCH OF THE SHEAR WALL RECTIFY A DEVIATION IN HIGH BUILDING BY USING SPRAYED CONCRETE. 铁道工程学报, 2004, 21(4): 136-139.