Analyses of Causes for the Deformation Intrusion Structure Ambit of Tunnel on Yichang-Wanzhou Railway and Its Treatment
ZENG Wei1, ZHANG Min-qing2
1. Changan University, Xi'an, Shanxi 710064, China; 2. Science and Technology Research Institute, China Railway Tunnel Group Co. Ltd, Luoyang, Henan 471009, China
Abstract:Research purposes: Yichang-Wanzhou railway has 159 tunnels and 21 deformation intrusion ambit had happen to 14 tunnels in the course of tunnel construction, up to 8.8 percent of all tunnels. The analyses of the causes for deformation intrusion structure ambit of tunnel are made and the relative measures for deformation intrusion structure ambit of tunnel are proposed.
Research conclusions: The sectional size and burying depth of tunnel are not the causes for deformation intrusion structure ambit, the main causes for it, unfavorable geological conditions, excavation method, auxiliary construction method, primary lining on time and feedback of information on measured data. The study shows: (1) For single track tunnel, the short benched method should be adopted with length of 10~15 meters and for double track tunnel, CRD or CD method should be adopted, or through the leading grouting and big steel tube support in advance, the short benched method should be adopted. (2) The obligate distortion amount of 5~10 cm should remain in advance to single track tunnel of the IV level rock, 10~15 cm to two track tunnel, 10~15 cm to single track tunnel of the j1 level rock, 15-20 cm to two track tunnel and 30~40 cm to tall terra stressed tunnel. (3) If the deformation speed rate is more than or equal to 5mm per day and the total accumulative deformation amount is more than or equal one-third of the obligate distortion amount, the primary lining should be reinforced, and if speed rate is more than or equal l0mm per day and the total accumulative deformation amount is more than or equal to one-third of the obligate distortion amount, the working face should be closed, supported and reinforced with radial grouting. (4) For soft rock and tall terra stressed tunnel, the integrated techniques of primary support and release and reinforcement and lining should be adopted. (5) For intrude structure ambit of the tunnel, first grouting can be conducted to the intrude structure ambit and then the steel frame should be exchanged.
曾蔚,张民庆. 宜万铁路隧道变形侵限原因分析与治理[J]. 铁道工程学报, 2008, 25(3): 42-49.
ZENG Wei, ZHANG Min-qing. Analyses of Causes for the Deformation Intrusion Structure Ambit of Tunnel on Yichang-Wanzhou Railway and Its Treatment. 铁道工程学报, 2008, 25(3): 42-49.