Abstract:Research purposes:Aiming at the problem that Xiangtangxi Marshalling Station in Nanchang railway hub is deficient in operation capacity, this paper systematically studies the upgrading plans of Xiangtangxi Marshalling Station, and puts forward the recommended plan though comparison of plans in economics, technology, traffic flexibility and operation capacity.
Research conclusions:Through the research on the upgrading plan of the marshalling station, it is decided to upgrade the up system of marshalling station into two-stage -four-yard and the down system into three-stage-three-yard by using level untwining reasonably with consideration of the numbers of freight train, train flow properties, flexibility of operation route and demands of transport development under condition of no way to adjust the existing layout largely. Therefore, the upgraded station can meet the near and long-term development demands and save the construction investment.
侯香菊. 向塘西编组站扩能改造方案研究[J]. 铁道工程学报, 2009, 26(4): 76-81.
HOU Xiang-ju. Research on the Upgrading Plan of Xiangtangxi Marshalling Station. 铁道工程学报, 2009, 26(4): 76-81.