Abstract:Research purposes:The purposes are to improve the accuracy of geological prediction in advance,speed up the construction process of the tunnel,accurately predict the scale and position of unfavorable geological body ahead the place of tunneling,reduce the construction investment and person death and injury during the construction and provide the reference to the similar works in future.
Research conclusions: There must be the following requirements for getting the accurate results of geological prediction:(1)The geological survey and investigation should be done on the site for geological structure and unfavorable geological body carefully,the quantitative prediction should be given with all prospecting methods and they should be verified each other.First of all.the accurate site surveyed data should be obtained when the prospecting method is used to survey.(2)The person for data processing should have the rich knowledge on the prospecting to correctly identify all numerical values of the parameters during the data processing.(3)The interpreter should eliminate the multi—interpreter of the prospecting result with rich geological knowledge when doing interpretation.
罗利锐,刘志刚. 超前地质预报在翔安海底隧道中的应用[J]. 铁道工程学报, 2009, 26(7): 80-83.
LUO Li—rui,LIU Zhi—gang. Application of the Geological Prediction in Advance in Construction of Xiang’an Submarine Tunnel. 铁道工程学报, 2009, 26(7): 80-83.