Abstract:Research purposes: The change law of post—construction settlement of one passenger dedicated line clay Loess subgrade without pre—loading is predicted under different standing times with curve fitting method.
Research conclusions: From the prediction analysis with curve fitting method it is concluded after excavation or filling of the subgrade,the subgrade settlement is large when the subgrade stands within 4 months,the subgrade settlement tends to slow down when the subgrade stands for 4-6 months and the subgrade settlement tends to stable when the subgrade stands for more than 6 months.Although there is the difference of settlement prediction between using logarithmic curve method and hyperbola method,but the difference Call be solved by using the medium value of these two methods to ensure the prediction conforming to the real situation.
Engineering management center of ministry of railway. Passenger special line foundation treatment technical manunal [M ]. Beijing: China railway publishing company, 2009.
[5] TB 10621-2009.高速铁路设计规范(试行) [S].
TB 10621-2009. Code for Design of High Speed Railway. [S].
[6] 铁建设[2005 ]160号,客运专线铁路路基工程施工质量 验收暂行标准. [S].
Railway Construction [2005]No. 160, Passenger Special Line Subgrade Construction Quality Check Tentative Standard. [S].
Engineering Management Center of Ministry of Railway. Passenger Special Line Deformation Observation Assessment Technical Manunal [M ]. Beijing: China Railway Publishing House,2009.
The Third Railway Survey and Design Institute Group Corporation. Application Research Report of Numerical Analysis Method in Subgrade Foundation Settlement Control[R ]. Tianjin: The Third Railway Survey and Design Institute Group Corporation, 2007.
[10] TB 10035-2006,铁路特殊路基设计规范[S].
TB 10035-2006. Code for Design on Special Subgrade Of Railway[S].