Abstract:Research purposes: The construction project near passenger dedicated line is easily affected by the contretemps to produce the influence on the safety of passenger dedicated line,with the features of the big and indeterminate risk. This paper studies the risk characteristic and the influence of the construction project near passenger dedicated line,and discusses the risk management of construction project near passenger dedicated line.
Research conclusions: The safety of passenger dedicated line must be put in the first place during the construction project near the passenger dedicated line,the policy of the " safety first,precaution crucial and comprehensive control" must be insisted on and the principle of the " consideration of the transport and construction together" should be followed to ensure the completion of transport and construction.
崔丽红. 临近客运专线铁路施工建设项目风险管理的研究[J]. 铁道工程学报, 2011, 28(9): 110-112.
CUI Li - hong. Research on Risk Management of Construction Project Near Passenger Dedicated Line. 铁道工程学报, 2011, 28(9): 110-112.
Cui Lihong. Research on Risk Management of Passenger - dedicated Line Construction Project[J]. Journal of Railway Engineering Society,2011( 1) : 96 - 98.