Abstract:Research purposes: It is not only to make full use of railway resources for operating suburban passenger train by using large city railway terminal,but also plays a significant role in the aspects including improving and optimizing the urban rail transit system,reasonably using the rail transit resources,cooperating and guiding the construction and development of the city.
Research conclusions :(1)Urban rail transit system should be designed based on the connection intension of central city,suburban and exurban,with different levels of rail transit configuration. Developing the suburban railway can improve the rail transit system of large cities. ( 2)The railway which has spare capacity in Beijing railway terminal can be a part of the urban rail transit system,and undertakes the function of urban rail transit.(3)There are three patterns on developing the suburban railway:extending the urban rail transit,taking advantage of existing railway by appropriate transformation to have the function of operating suburban passenger train,newly building suburban railway. ( 4)This research has reference meaning for the construction of large urban rail transit system and carrying out research on undertaking urban rail transit function by taking advantage of lines in existing railway terminal.
白宝英,杨卫盛. 利用铁路枢纽线路开行市郊列车的有关探讨[J]. 铁道工程学报, 2014, 31(1): 10-14.
BAI Bao-ying,YANG Wei-sheng. Exploration on the Issue Related to Operate Suburban Passenger Train by Using Railway Terminal Lines. 铁道工程学报, 2014, 31(1): 10-14.
The Third Railway Survey and Design Institute. Study on Beijing Existing Railway Network Resource Utilization and Operating Suburban Railway and Sectoral Coordination Mechanisms[R].Tianjin; The Third Railway Survey and Design Institute,2012.
Engineering Design and Appraisal Centre , Ministry of Railway. The Planning Atlas of Main Terminal of National Railway [ Z ].Beijing; Engineering Design and Appraisal Centre , Ministry of Railway , 2012.
Development and Reform Commission of Beijing. Beijing Rail Transit Construction's Planning Adjustment in the Near Future(2007~2016)[R].Beijing ; Development and Reform Commission of Beijing, 2012.
[ 4 ] GB 50091-2006,铁路车站及枢纽设计规范[S].
GB 50091-2006 , Code for Design of Railway Station and Terminal [ S ].
[5」GB 50090-2006,铁路线路设计规范[S].
GB 50090-2006 , Code for Design of Railway Line [ S ].