|
|
PLANE SURVEY AND VERTICAL CONTROL OF HIGH-SPEED RAILWAY |
LU Yongchen |
The Third Surv ey and Desig n Institute o f MOR |
|
|
Abstract The t rain o perating speed in high-speed rai lway is usually ov er 200 km /h. Whi le raising speed o n ex isting rai lway s in China , the Jing-Hu High-Speed Railw ay wi ll be const ructed wi th running speed o f 250km /h and having a total leng th of 1307m. The technica l requirements for high-speed railway s a re much higher tha n that fo r o rdina ry rai lw ays. In the surv eying w o rks for the high-speed railw ays, the plane survey and the v ertical cont rol are of the fi rst impo rta nce for successful co nstructio n of a high-speed rai lwa y. The paper infers and demonst rates an accuracy issue for plane surv ey and v ertical co nt rol o f hig h-speed railw ay , fo r the purpo se of o ffering a theoretical basis for surv ey, desig n, const ruction and maintenance of o ur na tional high-speed railw ay.
|
Received: 14 October 1998
|
|
|
|
|
1 陆月盛.测量学[M ].测绘出版社, 1996, 5
2 顾孝型.城市导线测量[M ].测绘出版社, 1984, 9
3 於宗俦.测量平差基础[M ].测绘出版社, 1984, 6
4 都世权.高速铁路线路大型机械维修养护体制[ R].铁三院高速铁路勘测设计调研报告. 1997 |
|
|
|