Abstract Based on the par ticular si tuatio ns o n the reform o f the existing Bao-Cheng, Cheng- Kun and Chua n-Qian Rai lway s, the a uthor proposes sev eral opinions concerned wi th the running speed, po si tio n of No. Ⅱ rai lw ay line, desig n g radient , const ruction method, etc. The problems w hich sho uld be taken inte a ttention are also pro posed.
|
Received: 10 October 1998
|
|
|
|