|
|
RESEARCH ON CONSTRUCTION MECHANICS O} TWO KINDS OF CONSTRUCTION METHOD OF DOUBLE-ARCH TUNNEL |
JIA Yong-gang1, WANG Ming-nian2 |
1.Beijing Urban Engineering Design and Research Institute Co. Ltd; 2. Dept of Underground Engineering,Southwest Jiaotong University |
|
|
Abstract At present,rock collapse in the construction of double-arch tunnel. Problems of large area crack exist in linings. In this paper author analyses the mechanics of two different construction methods of double- arch tunnel including displacement, force of principal support and safety factor, come to some conclusion, which can provide some reference on construction of double-arch tunnel.
|
Received: 06 February 2014
|
|
|
|
|
究[J] |
岩土力学,2002,23(6):821 - 824.
|
究[J] |
岩土工程学报,1998.20(5):27-30.
|
[2] |
王明年等.工程措施对控制隧道围岩变形的力学效果研
|
[4] |
王明年等.3孔小间距浅埋暗挖隧道地表沉降控制技术研
|
[1] |
王明年等.隧道仰拱的力学行为研究[M].岩土工程学
|
|
报,1996.18(1):46-53.
|
[3] |
王明年等.三车道公路隧道在不同构造应力作用下的力
|
|
学行为研究[J].岩土工程学报,1998.20(1):51-55.
|
|
|
|