APPLICATION OF MODIFIED ECCENTRIC -COMPRESSIVE METHOD IN THE TRANSVERSAL DISTRIBUTION OF LOADING OF CABLE-STAYED BRIDGE |
WANG Shao-liang1,HU Hai2,XIAO Yun-lin3 |
1Shenzhen Urban Transport Planning Center; 2China Railway Engineering Corporation; 3 Shenzhen Zhubo Engineering Design Co.Ltd |
|
|
Abstract The cable-stayed bridge, an indeterminate structure with more degrees of redundancy, consists of towers, cables and girders. Under loading, towers, cables and girders take part in working in cooperation with each other. Currently, the method of loading transversal distribution of cable-stayed bridge is the eccentric- compressive method. It means that cables sustain vertical forces and box girder sustains torsion moment. The torsion stiffness of girder with open cross section is assumed to be zero. So, the girder with open cross section can't sustain torsion. Based on the analysis of cables and girders working cooperation with each other, loading transversal distribution of girder mostly depends on the coupling of bending and torsion. In this paper the application of modified eccentric-compressive method has been discussed and some improvement on it has been also done. At the end of this paper, some results of examples obtained from SAP, a large finite element program, are given. Compared with the values obtained from the modified eccentric-compressive method and the improved method, it can be seen that the improved eccentric-compressive method is suitable for the cable-stayed bridge.
|
Received: 26 August 2005
|
|
|
|
|
[1]胡肇滋.桥跨结构简化分析-荷载横向分析[M].北京:人民交 通出版社,1996.
[2]李国豪,石洞.公路桥梁荷载横向分布计算[M].北京:人民交 通出版社,1987 .
[3]严国敏.现代斜拉桥[M].成都:西南交通大学出版社,1996.
[4]李乔.斜拉桥的受力特征分析[A].四川省公路学会桥梁专委 会98年桥梁学术讨论会论文集[C],1999.
[5]朱以文,韦庆如,顾伯达.微机有限元前后处理系统Vizi CAD及其应用[M].北京:科学技术文献出版社,1993.
[6]郑振飞,吴庆雄.斜、弯桥跨分析的广义梁各法[M].北京:人 民交通出版社,1998.
[7]奚绍中,郑世瀛.应用弹性力学[M].北京:中国铁道出版社, 1981.
[8]尼尔斯J?吉姆辛.缆索承重桥梁[M].北京:人民交通出版社, 1991.
|
|
|
|