铁道工程学报  2006, Vol. 23 Issue (1): 87-90    DOI:
Current Issue | Archive | Adv Search |
ANALYSIS OF SOIL REINFORCEMENT FOR THE STARTING AND ARRIVING OF SHIELD MACHINE IN METRO CONSTRUCTION
LI Da-yong1, WANG Hui2, WANG Teng3
1School of Civil Engineering, Shandong University of Science &Technology; 2Guangzhou Subway Design and Research Institute; 3Department of Geotechnical Engineering, Tongji University
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech