ANALYSIS OF SOIL REINFORCEMENT FOR THE STARTING AND ARRIVING OF SHIELD MACHINE IN METRO CONSTRUCTION |
LI Da-yong1, WANG Hui2, WANG Teng3 |
1School of Civil Engineering, Shandong University of Science &Technology; 2Guangzhou Subway Design and Research Institute; 3Department of Geotechnical Engineering, Tongji University |
|
|
Abstract Research purpose: In the shield tunnel construction, the starting and arriving of shield machine's technology is an important section. Whether the soil improvement is available or not have an impact on the safety of the shield machine's starting and arriving. So, reasonable construction methods for improved soil and necessary supervising measures guarantee the construction of shield tunnel.
Research method: Based on the authors' long time construction experiences, this paper analyzed the effects of soil improvement, scope of the soil improvement and application of construction for soil improvement. Finally, this paper summed up the accidents caused by worse soil improvement and the supervising method for soil improvement.
Research result: This research shows that the differences between soil improvement of end tunnel and general soil improvement are not only in strength demand and also in anti-seepage demand. For soil improvement of end of tunnel, economy is mended to be considered, which is determined by length, width, methods of soil consolidation. That is to say that soil improvement deals with whether the risk and width of soil improvement
|
Received: 20 October 2005
|
|
|
|
|
[2] |
秦爱芳,李永和.人工土层冻结法加固在盾构出洞施工中的应用[J].岩土力学,2004,25(增2):449-452.
|
[4] |
刘建国.水平旋喷搅拌桩工法应用研究[J].铁道工程学报.2002(2): 104-106.
|
[3] |
马洪建.SMW工法在天津地铁车站建设中的应用[J].铁道建筑,2004(6):24-26.
|
[1] |
尹旅超,朱振宏,李玉珍等.日本隧道盾构新技术[M].武汉:华中理工大学出版社,1999.
|
[5] |
王正寿,王会英.水泥粉喷桩法在天津港区加固软土地基中的应用[J].铁道工程学报.1997(3):78-84.
|
|
|
|