Electromagnetic Compatibility between Electrification Railway and Navigation Facilities |
ZENG Xiang-Ke |
The Second Survey and Design Institute of China Railway, Chengdu, Sichuan 610031, China |
|
|
Abstract Research purposes: Electromagnetic interference of electrification railway to navigation facilities of airfield must be obeyed to GB 6364. The defending distance between Jiaoji electrification railway and navigation facilities of Qingdao Liuting airfield cannot satisfy the defending standard. For avoiding relocating the railway line or the airfield, the electromagnetic compatibility measures should be researched in view of both economic and technical factor.
Research methods: Through theory analysis, the conditions of electromagnetic compatibility each other are found. And defending basis is provided for design through field testing and validation.
Research results: This paper recommended the scheme for “Current Situation of Electrification”. At the same time, this paper also proposed standby scheme and emergency scheme. In order to ensure flight safety, the checkout of aviation and the verification of defending effect should be implemented after electrification railway has the condition of power supply.
Research Conclusions: Passive interference and active interference of navigation facilities, which cannot satisfy national standards, are analyzed and the conclusions can provide the basis for design in theory. At the same time, the conclusions are verified through field testing and aviation checkout. The electromagnetic defending standards are satisfied both in conventional speed and in 200 km/h high-speed of the electrification railway.
|
Received: 19 July 2006
|
|
|
|
|
[1] |
GB 6364-86,航空无线电导航台站电磁环境要求[S].
|
[3] |
张林昌,等.“胶济线电气化对青岛流亭机场导航设备影响预测报告”评审会纪要[Z].成都:铁道第二勘察设计院,2002.
|
[5] |
铁科技[2006]68号文,200~250 km/h客运专线站后系统技术框架方案[S].
|
[4] |
张林昌,陈建成,等.“胶济铁路电气化改造工程对青岛流亭机场导航设施无线电干扰飞行校验结果”专家评估意见[Z].济南:济南铁路局建管中心,2006.
|
[2] |
周克生,等.胶济线电气化对青岛流亭机场导航设备影响预测报告[R].北京:北方交通大学抗电磁干扰研究中心,2002.
|
|
|
|