|
|
Research on the Newly-built Passenger Station of Intercity Railway |
YANG Yu, CHEN Gang, ZHENG Cai-hui |
China Railway Eryuan Engineering Group Co. Ltd. Chengdu, Sichuan 610031,China |
|
|
Abstract Research purposes: This paper discusses several questions, such as new station location plans selecting, station pattern confirming, yard equipment arranging and integrated transport junction planning of station area which brought by intercity railway when it joins into huge cities and needs to build new passenger station.
Research methods: The research is developed from the point of view of station location, station layout, station area planning, and expounds research content by the example of new Chengdu railway station.
Research results: This paper presents the principles and methods of newly-built station location selecting of intercity railway, expounds the key points of station layout,discusses the planning problems of station area road planning, traffic joining, transfer designing.
Research conclusions: ln the planning and designing process of intercity railway newly-built station, the needs of urban transport and railway passenger sport should be comprehensive considered, and urban transport and railway passenger transport should 6e coordinated developed based on optimization of station layout and station area planning.
|
Received: 27 July 2007
|
|
|
|
|
[1]徐行方,忻铁朕,项宝余.城际列车的概念及其开行条件 [J].同济大学学报,2003,31(4):433-436.
[2]杨宇,陈刚,袁光明.城际铁路车站设置模式研究[J]. 铁道运输与经济,107(9):11-14.
[3]朱成明,胡光明,刘亚东.城市公路客运交通枢纽选址规 划[J].重庆交通学院学报,2006,25(3):95-98.
[4]刘其斌,马佳贞,铁路车站及枢纽[M].北京:中国铁道 出版社,2003.
[5]周伟,姜彩良.城市交通枢纽旅客换乘问题研究[J].交 通运输系统工程与信息,2005,5(5):23-30
|
|
|
|