Research methods: Considering the landform along the line and city plan , the comments are made on the schemes of in-troducing a railway to Tianjin Beach International Airport, and the overall comparasons are also made in technology and economy with methods of statistics, comparason and evaluating its advantages and disadvantages.
Research results: By the study on the schemes of introducing a railway to Tianjin Beach lnternational Airport, a feasible thinking on alignment, track jointing location and a series of useful technical measures are presented.
Research conclusions: The scheme of introducing a railway to Tianjin Beach International Airport from Beijing-Shan-haiguan Railway is the most reasonable, economical and feasible, considering the factors of the airport current conditions, city plan, removal of exciting buildings and passengers convenience.