Simulation of Numerical Values of Surface Deformation Caused by Tunnel Construction |
LOU Xiao-ming , ZHENG Jun-jie , ZHANG Rong-jun |
Huazhong University of science and Technology , Wuhan , Hubei 430074,China |
|
|
Abstract Research purposes : The purposes are to make an evaluation of the influence on the surface buildings by construction of Shiqiaotu shallow buried tunnel with different construction methods and reinforcement measures.
Research methods : The simulations with 3 D finite-element numerical values are made for the surface deformation caused by the blast for construction of Shiqiaotu Shallow buried tunnel with triple steps temporary inverted arch method and two-side pilot tunnel method.
Research results : The excavation of tunnel in first step makes big influence on the surface settlement when triple steps temporary inverted arch method is adopted and excavations of tunnel in the fifth and sixth steps make big changes of settlement when two- side pilot tunnel method is adopted. The analyses of surface incline, surface curvature and level deformation show two-side pilot tunnel method is superior than triple steps temporary inverted arch method.
Research conclusions : For construction of the 5hiqiaotu Tunnel , it is proposed to adopt two-side pilot tunnel method along with necessary support and reinforcement measures for controlling the surface settlement and deformation and guaranteeing the safety of surface buildings.
|
Received: 14 November 2006
|
|
|
|
|
[1]谢飞鸿,尹伯悦,于亚伦.城市隧道开挖引起的地表变形 二维数值模拟计算[J].兰州交通大学学报(自然科学 版),2005,24(4):10-13.
[2]王明年,李志业,关宝树.小间距浅埋暗挖隧道地表沉降 控制技术研究[J].岩土力学,2002,23(6) :821-824
[3]杨龙才,周顺华,姚燕明.变跨度隧道施工引起的地表沉 降[J].同济大学学报,2003,31(4) :408-412.
[4]孙钧,朱合华.软弱围岩隧道施工性态的力学模拟与分 析[J].岩土力学,1994,15(4) :20-32.
[5]TB 10003—2005,铁路隧道设计规范[S].
[6]国家煤碳,工业局.建筑物、水体、铁路及主要井巷煤柱 留设与压煤开采规程[S].北京:煤炭工业出版社,2002.
|
|
|
|