铁道工程学报  2008, Vol. 25 Issue (11): 49-56    DOI:
Current Issue | Archive | Adv Search |
Treatment Technology for Water and Mud Bursting on 1·21 in Maluqing Tunnel of Yichang-Wanzhou Rail
ZHANG Min-qing1,HUANG Hong-jian1,ZHANG Sheng-xue2,WU Jun3,LI Xie-huai4
1. Yichang-wanzhou Railway Project Headquarter of China Railway Ministry, Enshi, Hubei 445000, China; 2. Wuhan Railway Administration, Wuhan, Hubei 430071,China; 3. Railway Ministry, Beijing 100844,China; 4. Beijing Earth Technical Development Co.,Ltd, Beijing 100029, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech