|
|
Research on the Prestressed Tendon Arrangement and Stress Calculation of Prestressed Concrete Continuous Girder with Segmental Construction |
LIU Jing-mian |
The Third Railway Survey and Design Institute Group Corporation, Tianjin 300142, China |
|
|
Abstract Research purposes ; The segmental casting method is often used in the full framing construction of prestressed concrete continuous girder because concrete casting in - site is too much. In order to counteract the contraction crack of concrete, the prestressing often needs to the concrete of girder. Taking one continuous girder of Taiyuan - zhongwei - Yinchuang Railway for example, this paper, through comparing the advantages and disadvantages of three arrangements methods of prestressed tendons, studies prestressed tendon arrangement and prestressing calculation of prestressed concrete continuous girder with segmental construction.
Research conclusions : It is proposed to adopt the tendons arrangements in full framing segmental construction when the connector can not be used because the construction site is small. The short tendons are stretched and anchored at the toothed plates and the long tendons are stretched and anchored at the ends of girder. The calculation and control of prestress in prestressed concrete continuous girder should be done according to the theoretical thickness of beam and the construction age,final tension age and the elastic ratio of concrete to counteracted the effect of concrete contraction with tensile stress.
|
Received: 24 September 2008
|
|
|
|
|
[1]TB 10002. 3 — 2005,铁路桥涵钢筋混凝土和预应力混凝 土结构设计规范[S].
[2]铁建设[2005] 157号,铁路混凝土结构耐久性设计暂行 规定[S].
[3]娄晓龙,周雅峰,耿蕴华.郑州市航海路立交桥设计[J]. 公路,2001 (9) :59-61
[4]范立础.预应力混凝土连续梁桥[M].北京:人民交通出 版社,1988.
[5]徐岳,王亚君,万振江.预应力混凝土连续梁桥设计 [M],北京:人民交通出版社,2000.
|
|
|
|