铁道工程学报  2008, Vol. 25 Issue (12): 61-65    DOI:
Current Issue | Archive | Adv Search |
Research on the Prestressed Tendon Arrangement and Stress Calculation of Prestressed Concrete Continuous Girder with Segmental Construction
LIU Jing-mian
The Third Railway Survey and Design Institute Group Corporation, Tianjin 300142, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech