Analyses of Causes for the Deformation Intrusion Structure Ambit of Tunnel on Yichang-Wanzhou Railway and Its Treatment |
ZENG Wei1, ZHANG Min-qing2 |
1. Changan University, Xi'an, Shanxi 710064, China; 2. Science and Technology Research Institute, China Railway Tunnel Group Co. Ltd, Luoyang, Henan 471009, China |
|
|
Abstract Research purposes: Yichang-Wanzhou railway has 159 tunnels and 21 deformation intrusion ambit had happen to 14 tunnels in the course of tunnel construction, up to 8.8 percent of all tunnels. The analyses of the causes for deformation intrusion structure ambit of tunnel are made and the relative measures for deformation intrusion structure ambit of tunnel are proposed.
Research conclusions: The sectional size and burying depth of tunnel are not the causes for deformation intrusion structure ambit, the main causes for it, unfavorable geological conditions, excavation method, auxiliary construction method, primary lining on time and feedback of information on measured data. The study shows: (1) For single track tunnel, the short benched method should be adopted with length of 10~15 meters and for double track tunnel, CRD or CD method should be adopted, or through the leading grouting and big steel tube support in advance, the short benched method should be adopted. (2) The obligate distortion amount of 5~10 cm should remain in advance to single track tunnel of the IV level rock, 10~15 cm to two track tunnel, 10~15 cm to single track tunnel of the j1 level rock, 15-20 cm to two track tunnel and 30~40 cm to tall terra stressed tunnel. (3) If the deformation speed rate is more than or equal to 5mm per day and the total accumulative deformation amount is more than or equal one-third of the obligate distortion amount, the primary lining should be reinforced, and if speed rate is more than or equal l0mm per day and the total accumulative deformation amount is more than or equal to one-third of the obligate distortion amount, the working face should be closed, supported and reinforced with radial grouting. (4) For soft rock and tall terra stressed tunnel, the integrated techniques of primary support and release and reinforcement and lining should be adopted. (5) For intrude structure ambit of the tunnel, first grouting can be conducted to the intrude structure ambit and then the steel frame should be exchanged.
|
Received: 14 January 2008
|
|
|
|
|
[1]关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2003.
[2]TB 10204-2002/J 163-2002,铁路隧道施工规范[S].
[3]汪世辉,刘振维.八卦山隧道台阶开挖长度与变形行为影响之研究[J/OL].中华技术,2005(7).
[4]TB 10003-2005/J 449-2005,铁路隧道设计规范[S].
[5]王梦恕.地下工程浅埋暗挖技术通论[M].安徽:安徽教育出社,2004:683-708.
[6]刘淳.五龙岭隧道中导坑初支变形的分析和应对措施[J].广东公路交通,1999(2):21-23.
[7]周恒,漆泰岳,于加云.部极软岩巷道补充锚注加固机理及应用[J].现代隧道技术,2006(5):55-59.
|
|
|
|