Control of Destablization Disaster of Typical Cutting Slope in Permafrost Region |
ZHAO X iang-qing1, XIONG Zhi-wen1, HAN Long-wu2, YANG Yong-peng2 |
1.ChinaAcademy ofRailway Sciences, Beijing 100081, China; 2.NorthwestResearch Institute ofCREC, Lanzhou,Gansu 730000, China |
|
|
Abstract Research purposes:W ith the developmentof thewestern China, theQinghai-TibetRailway has been built onQinghai-TibetPlateau, and the Qinghai-TibetHighway is now under reconstruction. They all cross the 550 km long permafrostregion. Based on the investigation, thispaperanalyzes the problems related to the subgrade ofQinghai- TibetRailway built in 2001~2002, especially the road cutting problem.
Research conclusions:Focusing on the seriously default sections of K 1 115 and K 1 128 judged as the artificial permafrost table, the analyses of the stability of the cutting slope is made in combination with the investigated hydrogeology information made in Apri,l 2008 and the special environment in permafrost region, the reasons for the subgrade problems are pointed outand the protectionmeasures are presented based on the lab tests and testequations for frozen soi.l
|
Received: 12 June 2008
|
|
|
|
|
[1] 吴紫旺,朱林楠,郭兴民.青康公路多年冻土区路堤的临 界高度[J].冰川冻土, 1998, 20(1): 36-41.
[2] 臧恩穆,吴紫旺.多年冻土退化与道路工程[M].兰州: 兰州大学出版社, 1999.
[3] 程国栋.局地因素对多年冻土分布的影响及其对青藏铁 路设计的启示[J].中国科学(D辑), 2003, 33(6): 602- 607.
[4] 王铁行,窦明健,胡长顺.多年冻土地区路基临界高度研 究[J].土木工程学报, 2003, 36 (4): 94-98.
[5] 黄小铭.高原冻土区铁路路基工程主要研究成果综述及 应用条件分析[Z].兰州:中铁西北科学研究院, 2000.
[6] 铁道部科学技术司.青藏铁路多年冻土科研成果汇编 [G].北京:铁道部科学技术司, 2002.
|
|
|
|