Discussion on the Overall Geological Survey for Metro Line2in X i'an |
YANG Zhi-guo ZHANG Fu-zhong |
China Railway FirstSurvey and Design InstituteGroup Co. Ltd., Xia' n, Shanxi 710043, China |
|
|
Abstract Research purposes: The overall survey formetro is a new managementmode of survey. Taking the overall geological survey forMetro Line 2 in Xi 'an, the discussion is made on the task, main working contents, working procedure and flow, role and technical supportof the overall survey for the purposesofensuring the smooth conduction of engineering survey and providing the supportto the design and construction and the reference to themetro construction in other cities.
Research conclusions:From the discussion on he overallgeological survey forMetro Line 2 inXia' n, it is concluded for the overall survey the key points and difficult points in the survey should be analyzed and judged, and the survey principle, the technical requirement and implement outline for the rock should be worked ou.t For ensuring reasonableness of the survey plan, the survey plan should be optimized, the factors and main links to influence the survey quality should be controlled, the operational procedure should be standardized, the survey report should be checked strictly, the correct geological information and the technical service should supply to the design and construction.
|
Received: 06 August 2009
|
|
|
|
|
[1] 铁道第一勘察设计院.西安市城市轨道交通二号线一期工程总体总包管理规定[R ].西安:铁道第一勘察设计院, 2006.
[2] 铁道第一勘察设计院.西安市城市轨道交通二号线一期工程详细勘察阶段岩土工程勘察实施大纲[R].西安:铁道第一勘察设计院, 2006.
[3] GB 50307)1999,地下铁道、轻轨交通岩土工程勘察规范[S].
[4] GB 50021)2001,岩土工程勘察规范[S].
[5] GB 50025)2004,湿陷性黄土地区建筑规范[S].
[6] DBJ 61)6)2006 /J 10821 -2006,西安地裂缝场地勘察与工程设计规程[S].
[7] TBJ 10012)2001,铁路工程地质勘察规范[S].
[8] TBJ 10014)98,铁路工程地质钻探规程[S].
[9] TB 10049)2004 /J 339)2004,铁路工程水文地质勘察规程[S].
[10] TB 10041)2003 /J 261)2003,铁路工程地质原位测试规程[S].
[11] GB 50007)2002,建筑地基基础设计规范[S].
[12]李晓昭,等.铁路工程勘察监理的探索[J].铁道工程学报, 2004(1): 11 -16.
|
|
|
|